Project

Location

Type

Status

Year

Victor Dupouy Hospital - Extension and restructuring of the M. Brès building

France, Argenteuil

Healthcare

Studies

2030

Location
France, Argenteuil
Type
Healthcare
Status
Studies
Year
2030
Program

Extension and restructuring of the Madeleine Brès building.
Outpatient and maternity functions, medical and technical functions, hospital admissions, logistics and hotel functions.
Capacity: 606 beds and seats, 21 operating rooms

Client

Centre Hospitalier Victor DUPOUY (Argenteuil)

Procedure

Design-Build

General contractor

Bouygues Bâtiment Ile-de-France

Architect

Brunet Saunier & Associés

Partner Architect

BaSo Architectures

Hospital Consultant

Gerold Zimmerli

BSA Team

David Tessier - Project Manager, Frédéric Alligorides, Clément Billaquois, Mauve Esteoule-Sibilli, Maria Leopizzi, Jacques Lévy-Bencheton, Michel Roux-Dorlut, Mounia Saiah, Joana Skendi, Isabelle Vasseur, Hugo Viellard,

Net Floor Area

62 000 sq. m

Construction Cost

235 M€ w/o VAT (2022 value)

argenteuil, brunet saunier architecture, brunet saunier & associés, bouygues, baso, hospital, health, hospital architecture, madeleine bres

Rothschild Foundation Hospital

France, Paris

Healthcare

Ongoing

2025

Location
France, Paris
Type
Healthcare
Status
Ongoing
Year
2025
Program

Expansion and Restructuring Project of the Foundation.
Comprehensive overhaul of patient and logistical circuits, reception, neuroscience consultations, day hospital, hospitalizations, intensive care, operating block, ambulatory cataract center, and imaging.

Procedure

Public Procurement (MOP law)

Client

Fondation Ophtalmologique A. de Rothschild

Lead architect

Brunet Saunier & Associés

Partners team

Ingérop (engineering), Us&Co (construction economist), Ingérop (acoustics), Diapason médiation (mediation), Cicad (phasing), Playtime (renderer)

BSA team

Clément Billaquois (project leader), Franck Courari, Hugo Viellard and Gerold Zimmerli

Net Floor Area

12 500 sq. m

Construction Cost

45 M€ w/o tax (value 2023)

La Broye Intercantonal Hospital

Switzerland, Payerne

Healthcare

Ongoing

2025

Location
Switzerland, Payerne
Type
Healthcare
Status
Ongoing
Year
2025
Program

Extension and restructuration of Payerne’s Hospital
Operating room, intensive care, maternity, hospitalization, consultations, day hospitals
Capaciy : 175 beds and places, 4 operating rooms

Client

Hôpital Intercantonal de la Broye

Procedure

Parallel Mandate of Studies (MEP)

Lead architect

Brunet Saunier & Associés

Partner architect

Architram

Hospital consultant

Dr Kareem Boulos

Partners team

Bg Ingenieurs Conseils (Engineering), Playtime (renderer)

BSA team

Franck Courari (project leader), Hugo Viellard

Net Floor Area

19 500 sq. m

Construction cost

60 M€ w/o tax (2019 value)

Lariboisière New Hospital

France, Paris

Healthcare

Construction

2025

Location
France, Paris
Type
Healthcare
Status
Construction
Year
2025
Program

Restructuring of a portion of the historic hospital (outpatient services, day hospital) and construction of a new building including emergency department, imaging, nuclear medicine, maternity ward, operating rooms, critical care, inpatient units, sterilization, and a clean unit.
Capacity: 630 beds and spaces, 17 operating rooms.

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Bernard Desmoulin

Hospital consultant

Gerold Zimmerli

Partners team

Snc – Lavalin (fluids, elevators, transport, plumbing, HVAC), Tpfi (demolition, structure, VRD, OPC, acoustics), Alto (HEQ), Ae 75 (construction economist), Bassinet et Turquin (landscape designer), Fl Conseil (logistics consultant), Kresterion (digital hospital consultant), By-Encore (renderer), ArchiGraphi (movie), Bauraum (model maker)

BSA team

Pierre Parquet (competition project leader), David Tessier, Jérémy Toumine, Corto Troude, Feissal Benkhelifa

Built surface

54 000 m²

Construction cost

180 M€ w/o tax (2022 value)

Caribbean Nuclear Imaging Institute

France, Fort-de-France

Healthcare

Completed

2024

Location
France, Fort-de-France
Type
Healthcare
Status
Completed
Year
2024
Program

Nuclear medicine, anatomic and cytologic pathology, pharmaceutical technology, and cyclotron unit.

Client

CHU de Martinique

Procedure

Design-Build

General Contractor

Sogéa Martinique/Tunzini Antilles

Architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Edeis (construction economist, fluids technical consultant and acoustic expert), Hauss (structure technical consultant), Playtime (renderer), Jean Chamiot (site monitoring architect)

BSA team

Hugo Viellard (project manager) and Eric Zimmerli, Marie-Ange Monthiers, Michel Roux-Dorlut, Charles Bazzaz

Net Floor Area

5 900 sq. m

Construction cost

20 M€ w/o tax (2020 value)

Photographer

11H45

Chevilly-Larue subway station

France, Chevilly-Larue

Infrastructural

Completed

2024

Location
France, Chevilly-Larue
Type
Infrastructural
Status
Completed
Year
2024
Program

Grand Paris Express train station, line 14 South

Client

RATP

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés (Groupement Elios)

Partners team

Setec Tpi (lead technical services consultant), Sodecset (construction economist), Kahle Acoustics (acoustics expert), Light Cible (lighting expert), Setec Bâtiment (preventionist), Renderstorm (renderer)

BSA team

Nicolas Senly (project manager), Charles Bazzaz

Net Floor Area

4 500 sq. m

Construction Cost

50 M€ w/o VAT (2022 value)

Photographer

11h45

brunet saunier, brunet saunier & associés, brunet saunier architecture, subway station, ratp, ligne 14, chevilly-larue, grand paris
brunet saunier, brunet saunier & associés, brunet saunier architecture, subway station, ratp, ligne 14, chevilly-larue, grand paris
brunet saunier, brunet saunier & associés, brunet saunier architecture, subway station, ratp, ligne 14, chevilly-larue, grand paris
1/3

Interventional and Surgical Center

France, Rennes

Healthcare

Construction

2023

Location
France, Rennes
Type
Healthcare
Status
Construction
Year
2023
Program

Ambulatory care center, operating block, critical care, conventional surgical hospitalizations, tertiary medical forum, sterilization, logistical functions.
Capacity: 408 beds and places, 55 operating rooms.

Client

CHU de Rennes

Procedure

Design-Build

General Contractors

Sogéa Bretagne Btp/Vinci Construction

Architect

Brunet Saunier & Associés

Partners team

Edeis (Engineering), Fl Conseil (logistics consultant), Sertco (structure technical consultant), Gpl Expert (digital hospital consultant), Sigma Acoustique (acoustics expert), Armor Ingénierie (SSI), Franck Boutté Consultants (environment), Cegelec (Electricity), Pelagos Aéro (helipad), R2m (economist), Philippe Villien (urban planner), Luxigon/Arte Factory/By Encore (renderers), Fred Manen/Graphic’images Nantes (movie)

BSA team

Garcie de Navailles (project leader), Franck Courari, Thomas Giroud, Clément Billaquois, Eric Zimmerli, Gerold Zimmerli

Net Floor Area

50 400 sq. m

Construction cost

136 M€ w/o tax (2019 value)

Algiers University Hospital Center

Algeria, Algiers

Healthcare

Stopped

2022

Location
Algeria, Algiers
Type
Healthcare
Status
Stopped
Year
2022
Hospital consultant

Gerold Zimmerli

Architecte

Brunet Saunier & Associés

Partners team

By-Encore (renderer)

BSA team

Nicolas Senly (project manager), David Tessier, Marie-Ange Monthiers, Magdalena Sroczynska, Eric Zimmerli, François Gallet, Hugo Viellard, Frédéric Alligoridès, Isabelle Vasseur, Corto Troude

Building companies

CSCEC / Betom

Meilahti Trauma and Cancer Centre

Finland, Helsinki

Healthcare

Completed

2022

Location
Finland, Helsinki
Type
Healthcare
Status
Completed
Year
2022
Program

Trauma Center and Cancer Center.
Emergency services, organ transplantation and plastic surgery departments, outpatient trauma center, oncology, imaging, cafeteria, and logistics services.
Capacity: 395 beds and places.

Client

Hospital District of Helsinki and Uusimaa (HUS)

Procedure

Public Procurement

Lead architect

AW2 Architects/Architecture Workshop Finland Ltd

Partner architects

Brunet Saunier & Associés, B&M Architecture Ltd, Harris – Kjisik Ltd

Hospital consultant

Gerold Zimmerli

Partners team

A-insinöörit Ltd (structure technical consultant), Consortium Granlund-Ramboll (energy and fluids technical consultant), Akukon Ltd (acoustics expert)

BSA team

Lassi Mustonen (Paris), Hanna Tjukanov (Helsinki), Julien Mortet (Helsinki)

Net Floor Area

69 000 sq. m

Construction cost

230 M€ w/o tax (2015 value)

Photographer

Tuomas Uusheimo

Award

2020 Tekla Global BIMM Award of the best public project

Issy Station

France, Issy-les-Moulineaux

Infrastructural

Construction

2022

Location
France, Issy-les-Moulineaux
Type
Infrastructural
Status
Construction
Year
2022
Program

Grand Paris Express train station, line 15

Client

Société des Grands Projets

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Setec Tpi/Ingerop (lead technical services consultant), Ingerop (construction economist), Avls (acoustics expert), Arcora (facades), Vulcaneo (preventionist), Renderstorm (renderer), New-tone (model maker)

BSA team

Isabelle Vasseur (project manager), Cédric Baelde, Nicolas Senly, Charles Bazzaz

Built surface

6 000 sq. m

Construction cost

125 M€ w/o VAT (2014 value)

CHU de Reims, phase 2

France, Reims

Healthcare

Competition

2022

Location
France, Reims
Type
Healthcare
Status
Competition
Year
2022
Program

Nouvel Hôpital de médecine, 353 lits d’hébergements, Dialyse, Bloc Opératoire, UCA, Consultations, Imagerie, Pharmacie

Client

CHU de REIMS

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital Consultant

Gerold Zimmerli

Partner architect

PACE Architectes

Partners team

In Silico Architecture (town planner-landscape), Us&Co (construction economist), Prologue (logistics expert), SICC (security), Otéis (Engineering consultant), Franck Boutté (HEQ), Sigma (acoustics expert)

BSA Team

Clément Billaquois, Felix Gautherot, Garcie de Navailles, Hugo Viellard

Net Floor Area

55 613 sq. m

Construction cost

129 M€ w/o tax (2022 value)

Sambre Avesnois Hospital Center

France, Maubeuge

Healthcare

Completed

2021

Location
France, Maubeuge
Type
Healthcare
Status
Completed
Year
2021
Program

Hospitalizations, critical care, dialysis, emergency, imaging, operating room, maternity, day hospital, medical and hospitality logistics, administrative tertiary.
Capacity: 307 beds and places and 5 operating rooms.

Client

Centre hospitalier de Sambre Avesnois

Procedure

Design-Build

General Contractor

Bouygues Bâtiment Nord-Est

Architect

Brunet Saunier & Associés

Partners team

Montaron (roads & networks), Wsp (engineering consultant), Etamine (HEQ consultant), Labanq (renderer), Vectuel (movie), Bauraum (model maker)

BSA team

Franck Courari (project manager), François Gallet, Garcie de Navailles, Vasiliki Noula, David Tessier

Net Floor Area

33 000 sq. m

Construction cost

66 M€ w/o VAT (2016 value)

Photographer

11H45

Padua University Hospital

Italy, Padova

Healthcare

Competition

2021

Location
Italy, Padova
Type
Healthcare
Status
Competition
Year
2021
Program

New hospital complex

Client

Azienda Ospedale Universita Padova

Procedure

Public Procurement

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Milan Ingegneria, Prisma Engineering, Michel Desvigne Paysagiste, Llewelyn Davies, Transsolar Klima Engineering, P.ET.R.A., Ing. Antonio E. Corbo, Studio Viridis, Dott. Forestale Dino Calzavara, MIC Mobility in Chain, Ing. Cesare Trebeschi, Müller-BBM, Studio Geol. Ass. Graziano e Massi

BSA team

Hugo Viellard (chef de projet), David Tessier, Clément Billaquois, Mounia Saïah, Félix Gautherot

Net Floor Area

193 000 sq. m

Construction cost

357 M€ w/o tax (2021 value)

Lariboisière University Hospital, Morax Building

France, Paris

Healthcare

Completed

2021

Location
France, Paris
Type
Healthcare
Status
Completed
Year
2021
Program

Technical services (workshops, biomedical engineering, IT department), anatomy and pathology laboratories, energy center.

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Bernard Desmoulin

Hospital consultant

Gerold Zimmerli

Team

EDEIS (fluids, elevators, transport, plumbing, HVAC), Tpfi (demolition, structure, VRD, OPC, acoustics), Alto (HEQ engineering), AE 75 (construction economist), Bassinet et Turquin (Landscape architect, competition), élémenTerre-paysages (landscape designer), Fl Conseil (logistics consultant), Kresterion (digital hospital consultant), By-Encore (renderer), ArchiGraphi (movie), Bauraum (model maker)

BSA team

Competition : Pierre Parquet (project leader), David Tessier, Jérémy Toumine, Corto Troude, Feissal Benkhelifa
Studies : Philippe Vasseur (project director), Mauve Esteoule-Sibili (project leader), David Tessier, Magdalena Sroczynska, Florian Arrivault, Celine Chambost, Marie-Ange Monthiers

Net Floor Area

4 500 sq. m

Construction cost

20 M€ w/o tax (2021 value)

Photographer

11h45

HUG, Children Hospital

Switzerland, Geneva

Healthcare

Competition

2021

Location
Switzerland, Geneva
Type
Healthcare
Status
Competition
Year
2021
Program

Children’s hospital, hospitalizations, outpatient care and technical platform.

Client

Hôpitaux Universitaires de Genève (HUG)

Procedure

Public Procurement

Lead Architect

Brunet Saunier & Associés

Partner architect

Architram

Hospital consultant

Gerold Zimmerli

Partners team

Thomas Jundt ingenieurs civils (structural technical consultant), BG (fluids technical consultant), Paris Picture Club (renderer)

BSA Team

Hugo Viellard (chef de projet), Clément Billaquois, David Tessier, Mounia Saïah, Félix Gautherot, Mihaela Palade, Clémence Heuzé

Net Floor Area

42 000 sq. m

Construction cost

200 M CHF w/o tax (2021 value)

Jules Bordet New Institute

Belgium, Brussels

Healthcare

Completed

2021

Location
Belgium, Brussels
Type
Healthcare
Status
Completed
Year
2021
Program

Reconstruction of the cancer centre on the site of the Université libre de Bruxelles (ULB) with integrated cancer research laboratories, 8 operating rooms, 250 hospital beds and 40 day hospital beds

Client

Institut Jules Bordet, AAMR (Project manager assistance)

Procedure

Public Procurement

Lead architect

Brunet Saunier & Associés

Partner architect

Archi 2000

Hospital consultant

Gerold Zimmerli

Partners team

Tpf Group (technical services consultant), Emmer-Pfenninger (facade technical consultant), Apor (micro location), Golem Images (Xavier Depaule), Philippe Harden, Frédéric Manen (renderer), Alpha-Volumes (model maker)

BSA team

Mauve Estéoule-Sibilli (project manager PRO2 to Construction), Jürgen Fallert et Astrid Beem (project manager Competition to PRO1), Frédéric Alligorides, Cédric Baelde, Simon Berger, Florence Canal, Marie Chaumaz, Franck Courari, Aurélie Estorges, Myrtille Fakhreddine, Marine Leconte, Delphine Lottin, Mawari Nunez, Isabelle Redon, Julie Rosier, Mounia Saiah, Nicolas Senly, Magdalena Sroczynska, Isabelle Vasseur

Net Floor Area

80 600 sq. m

Construction cost

189 M€ w/o tax (2019 value)

Photographers

Jeroen Verrecht, Séverin Malaud

Award

Nominated for the 2023 AFEX Award

Meaux Saint-Faron Hospital Center

France, Meaux

Healthcare

Competition

2020

Location
France, Meaux
Type
Healthcare
Status
Competition
Year
2020
Program

Reconfiguration and modernization of the Meaux-Saint-Faron hospital site

Client

Grand Hôpital de l’Est Francilien (GHEF)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Ingerop (Engineering consultant), Us&Co (Construction economist), Alto (HEQ), Cicad (OPC), Sigma acoustique (Acoustics expert), Elementerre (Landscaper), By-Encore (renderer), Bauraum (architectural model maker)

BSA team

Hugo Viellard (project manager), François Gallet, Marie-Ange Monthiers, Eric Zimmerli, Michel Roux-Dorlut, Corto Troude

Net Floor Area

46 000 sq. m

Construction cost

84 M€ w/o VAT (2020 value)

Extension of the Sud Seine et Marne Hospital Center

France, Fontainebleau

Healthcare

Completed

2020

Location
France, Fontainebleau
Type
Healthcare
Status
Completed
Year
2020
Program

Technical platform (operating room, imaging, short-stay hospitalization, resuscitation and continuous monitoring), day hospital, medicine and surgery. Capacity: 183 beds and places, 5 operating rooms.

Client

Centre Hospitalier Sud Seine-et-Marne

Procedure

Design-Build

General Contractor

Inso Spo (mandataire) Etablissement Hanny

Architect

Brunet Saunier & Associés

Partner architect

François Jestaz

Partners team

Bg Ingenieurs Conseils (technical services consultant), Peb (construction economist), Acoustique et Conseils (acoustics expert), Eléments Ingénieries (HEQ consultant), Frédérique Garnier (landscape expert), Renderstorm (renderer)

BSA team

Mounia Saïah (project manager) and Magdalena Sroczynska, Corto Troude

Net Floor Area

15 000 sq. m

Construction cost

34 M€ w/o VAT (2016 value)

Photographer

11H45

Henri Mondor Hospital, Reine Building

France, Créteil

Healthcare

Completed

2020

Location
France, Créteil
Type
Healthcare
Status
Completed
Year
2020
Program

21-OR suite, PACU, 85 ICU beds.
Connected to existing IGH.

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Procedure

Design-Build

General Contractor

Rabot Dutilleul Construction

Architect

Brunet Saunier & Associés

Partners team

Wsp (technical services consultant), Us&Co (construction economist), Sigma acoustique (acoustics expert), Casso et associés (preventionist), Eodd (HEQ consultant), Fl Conseil (logistics consultant), Golem (renderer)

BSA team

Olivier Contré, François Gallet, Franck Courari, Clément Billaquois

Net Floor Area

13 800 sq. m

Construction cost

38 M€ w/o VAT (2016 value)

Photographer

11H45

Grand Paris Nord University Hospital

France, Saint-Ouen

Healthcare

Ongoing

2020

Location
France, Saint-Ouen
Type
Healthcare
Status
Ongoing
Year
2020
Program

Grouping of activities of Bichat and Beaujon hospitals.
Conventional hospitalizations in medicine and surgery, obstetrics and neonatology, outpatient care, diagnostics, interventional procedures, critical care, emergencies, imaging and nuclear medicine, research platform in biology (including infectious diseases, genetics, molecular biology).
Capacity: 1,274 beds and places and 48 interventional and operating rooms

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Procedure

Public Procurement (MOP law)

Lead architect

Renzo Piano Building Workshop

Partner Architect

Brunet Saunier & Associés

Partners Team

SLETEC Ingénierie (Construction economist), INGEROP Conseil & Ingénierie (Structure, fluids, fire safety technical consultant and micro-implementation)

BSA team

Franck Courari (project manager), Maria Leopizzi, Corto Troude, Garcie de Navailles, Gerold Zimmerli, Hugo Viellard, Sara Adimi, Mounia Saïah, David Tessier

Net Floor Area

168 000 sq. m + 33 00 sq. m parking

Construction cost

544 M€ w/o tax (2020 value)

Photographer

Michel Denancé (mockup)

Condorcet Campus

France, Aubervilliers

Research/Teaching

Completed

2019

Location
France, Aubervilliers
Type
Research/Teaching
Status
Completed
Year
2019
Program

Urban planning for the campus “City of humanities and social science”, research and training building, university restoration spaces and underground parking

Client

Établissement Public de Coopération Scientifique (EPCS), Campus Condorcet

Procedure

Public Private Partnership (PPP)

Lead architect

Brunet Saunier & Associés, avec Agence TER (landscape and urban planner, coordinators), Antonini Darmon Architectes, Jean-Baptiste Lacoudre Architectures, K architectures, Jean-Christophe Quinton Architecte

Partners team

Wsp (engineering), Oasiis (HEQ), Quidort (kitchen engineering), Betip (VRD)

BSA team

Olivier Contré (project director), Florian Ligier (project manager), Hugo Viellard, Antonin Eyssette, Pierre-Emmanuel Fieschi, Antoine Kersse, Benoit Pinson, Joana Skendi, David Tessier, Corto Troude

Building companies

Gtm Bâtiment (leader), Adim Concepts (real estate developer), Cofely Services (exploitation/maintenance)

Net Floor Area

15 500 sq. m

Photographer

11h45

National Hospital of Obstetrics and Gynecology

Vietnam, Hanoï

Healthcare

Completed

2019

Location
Vietnam, Hanoï
Type
Healthcare
Status
Completed
Year
2019
Program

Design sketch of the new building on the site of the “National Hospital of Obstetrics and Gynecology” with 200 hospitalization beds, 1 operating room with 4 rooms, 1 delivery room, 1 neonatal intensive care unit, 1 emergency department and consultations

Client

Le Delta

Procedure

Direct order purchase

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Vncc (Vietnam National Construction Consultants Corporation) (local partner)

BSA team

Hugo Viellard (project manager), Franck Courari

Net Floor Area

13 650 sq. m

Laboratories Paris-Est Créteil University

France, Créteil

Research/Teaching

Competition

2019

Location
France, Créteil
Type
Research/Teaching
Status
Competition
Year
2019
Program

Construction of the biomedical research building at the Faculty of Medicine in Créteil

Client

Université Paris-Est Créteil Val de Marne

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

BG Ingénieurs Conseils (Engineering consultant), Us&Co (construction economist), 2B Concept (laboratories expert), Sigma Acoustique (acoustics expert)

Net Floor Area

6 000 sq. m

Construction cost

13,7 M€ w/o tax (2019 value)

Mother-Child Unit of the Sens Hospital Center

France, Sens

Healthcare

Competition

2019

Location
France, Sens
Type
Healthcare
Status
Competition
Year
2019
Program

Construction of a Women’s and Children’s Health Center, an emergency department, a pulmonary day hospital, a hemodialysis unit, consultation rooms and a helipad.

Client

Centre Hospitalier de Sens

Procedure

Design-Build

General Contractor

Etablissement Hanny

Architect

Brunet Saunier & Associés

Net Floor Area

12 000 sq. m

Construction cost

25,5 M€ w/o tax ( 2019 value)

I.Ceram Factory

France, Limoges

Commercial/Industry

Competition

2019

Location
France, Limoges
Type
Commercial/Industry
Status
Competition
Year
2019
Program

Creation of a new site at the Ester Technopole park in Limoges

Client

I.Ceram

Procedure

Private competition

Lead architect

Brunet Saunier & Associés

BSA team

Hugo Viellard (project manager), François Gallet

Net Floor Area

5 000 sq. m

Building Boulevard Davout

France, Paris

Residential

Competition

2018

Location
France, Paris
Type
Residential
Status
Competition
Year
2018
Program

Renovation and expansion of a building complex

Client

Régie Immobilière de la Ville de Paris (RIVP)

Procedure

Public Procurement (MOP law)

Lead architect

Atelier Martel

Partner architect

Brunet Saunier & Associés

Office building, ZAC Cambacérès

France, Montpellier

Commercial/Industry

Competition

2018

Location
France, Montpellier
Type
Commercial/Industry
Status
Competition
Year
2018

INSEAD, Campus Europe

France, Fontainebleau

Research/Teaching

Stopped

2018

Location
France, Fontainebleau
Type
Research/Teaching
Status
Stopped
Year
2018
Client

INSEAD, The Business School for the World

Procedure

Private competition

Lead architect

Brunet Saunier & Associés

Partners team

Bg ingénieurs (technical services consultant), Charpente Concept (wood structure consultant), Vpeas (construction economist), Sigma (acoustics expert), Ter (landscape expert), Arwytec (kitchen designer), Lm Ingéniérie (audiovisual expert), Labank (renderer), Bauraum (model maker)

BSA team

Garcie De Navailles-Labatut (project manager), Florian Arrivault, Clément Billaquois, Thomas Giroud, Antoine Maréchal, Victoria Seux, Hugo Viellard

Net Floor Area

9 500 sq. m

Construction cost

49 M€ w/o VAT (2018 value)

New Limmattal Hospital

Switzerland, Zurich

Healthcare

Completed

2018

Location
Switzerland, Zurich
Type
Healthcare
Status
Completed
Year
2018
Program

Emergency, intensive care, operating room, imaging, conventional hospitalizations, consultations, communal areas.
Capacity: 200 beds and places, 8 operating rooms.

Client

Spitalverband Limmattal

Procedure

Design-Build

General Contractor

Losinger Marazzi company

Architect

Brunet Saunier & Associés

Partner architect

Bfb Architekten

Hospital consultant

Gerold Zimmerli

Partners team

Emmer Pfenninger Partner Ag (facade technical consultant), Bg Ingenieure und Berater Ag (structure technical consultant), Hans Abicht Ag (fluids technical consultant), Bösch Ag (health consultant), Eproplan Ag et Scherler Ag (electricity consultant), Gartenmann Ag (building physics consultant), Mibag (facility Management), Gesswein Landschaftsarchitekten (landscape consultant), Golem Images (renderer), Archigraphie (movie)

BSA team

Caspar Muschalek (project manager) and Mauve Esteoule-Sibilli, Jürgen Fallert, Kristina Ilieva, Magdalena Sroczynska, Frédéric Alligoridès (BIM-Manager)

Net Floor Area

48 500 sq. m

Construction cost

150 M CHF w/o tax (2014 value)

Photographer

Bruno HELBLING

Awards

Silver BIM award, International Category

Trousseau New Hospital

France, Tours

Healthcare

Competition

2018

Location
France, Tours
Type
Healthcare
Status
Competition
Year
2018
Program

Construction of the new Trousseau Hospital

Client

CHRU de Tours

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Ivars & Ballet

Partners team

Philippe Villien (urban planner), WSP France (Engineering consultant), Inddigo (HEQ consultant), Cyprium (construction economist), FL conseil (logistics expert), Sigma (acoustics expert), GPL expert (smart hospital expert), Integral Ruedi Baur (signage designer), Philippe Bourrel PB Consulting (helipad)

Net Floor Area

70 000 sq. m

Construction cost

140 M€ w/o tax

Paradise Masters

Object

Completed

2018

Location
Type
Object
Status
Completed
Year
2018
Description

White polypropylene Masters armchair: ©Philippe Starck for Kartell. Goose feathers (Anseris aequabis), including flight feathers, down, and quills.

Architect

Jerome Brunet with Thomas Monet 

Partner team

Plume de Paris (feather master)

Caen Hospital Center Reconstruction

France, Caen

Healthcare

Competition

2018

Location
France, Caen
Type
Healthcare
Status
Competition
Year
2018
Client

CHU de Caen

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

VIB Architecture

Net Floor Area

110 000 sq. m

Construction cost

237 M€ w/o tax

Nord Franche-Comté Hospital

France, Trévenans

Healthcare

Completed

2017

Location
France, Trévenans
Type
Healthcare
Status
Completed
Year
2017
Program

Medical Surgical Obstetrical Unit - Capacity : 772 beds

Client

Centre Hospitalier de Belfort-Montbéliard

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Serge Gaussin & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (Engineering and construction economist), Ceef (facades), Tribu (HEQ), Delphi, Cial (Acoustics), Péna & Peña, Oikos (landscape designers), Encore Heureux, Golem Images, Philippe Harden (renderer), Alpha Volumes (model maker)

BSA team

Olivier Contré (competition and studies project manager), Philippe Vasseur (construction project manager) and Frédéric Alligorides, Giulio Avventi, Cedric Baelde, Pascale Blin, Franck Courari, Mauve Esteoule-Sibilli, Jürgen Fallert, Myrtille Fakhreddine, François Gallet, Karine Grimaux, Phuong Pham Hoang, Marine Leconte, Florian Ligier, Garcie de Navailles, Julie Rosier, Michel Roux-Dorlut, Mounia Saïah, Laurence Sou

Net Floor Area

79 000 sq. m

Construction cost

168 M€ w/o tax (2012 value)

Photographers

11H45, Michel DENANCE

Award

2017 Equerre d’Argent Award, “Activity Spaces” category

HUG, Gustave Julliard Building

Switzerland, Geneva

Healthcare

Completed

2016

Location
Switzerland, Geneva
Type
Healthcare
Status
Completed
Year
2016
Program

Second bed block, hospital extension and public space redevelopment. Operating block, inpatient units, intensive care, continuous monitoring. Capacity: 472 beds and places, 6 operating rooms.

Client

République et canton de Genève, Département des Finances (DF)

Lead architect

Brunet Saunier & Associés

Partner architects

Burckhardt+Partner, Odile Seyler et Jacques Lucan, Gerold Zimmerli

Partners team

Burckhardt+Partner (construction economist), Thomas Jundt ingenieurs civils (structure technical consultant), Emmer Pfenninger (facade technical consultant), Tecnoservice Engineering (Patrice Anstett) (fluids technical consultant), Frédéric Manen, Golem Images (Xavier Depaule) (renderer)

BSA team

Astrid Beem (project manager) and Frédéric Alligorides, Simon Berger, Franck Courari, Jürgen Fallert, Chloé Giroud, Karine Grimaux, Léonard Gurtner, Renaud Marret, Mawari Nunez, Magdalena Sroczynska, Stéphane Zimmerli

Net Floor Area

41 000 sq. m

Construction cost

140 M€ w/o tax (2010 value)

Photographer

Thomas Jantscher

Award

2018 AFEX Award Nominee

Pôle Ecotox

France, Alixan-Valence

Research/Teaching

Completed

2016

Location
France, Alixan-Valence
Type
Research/Teaching
Status
Completed
Year
2016
Program

Platform for research and expertise in environmental toxicology and ecotoxicity

Client

Drôme Aménagement Habitat, Rovaltain Research Company (user)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Agc Concept Architectes (operation architects), Rfr Sas (structure), Cet ingénierie (fluids), Elements Ingénieries (HEQ), Cap Horn Solutions (acoustics), Mazet & Associés (economist), Ixans (OPC), Bureau Alpes Contrôles (controle), Bureau Veritas (SPS coordinator), Oikos (landscape designer), Golem Images (renderer)

BSA team

Bertrand Renaudin (project leader), Jürgen Fallert, Florian Ligier, Daniel Otero, Pierre Parquet, Joana Skendi, David Tessier

Net Floor Area

12 670 sq. m, 10 000 sq. m exterior spaces

Construction cost

30,2 M€ w/o tax (2014 value)

Photographer

Edouard DECAM

Metropole Savoie Hospital Center

France, Chambéry

Healthcare

Completed

2015

Location
France, Chambéry
Type
Healthcare
Status
Completed
Year
2015
Program

Emergency, imaging, critical care, dialysis, pediatrics, inpatient care, consultations, day hospital, ambulatory surgery, laboratories, logistics, parking.
Capacity : 771 beds.

Client

Centre Hospitalier de Chambéry

Procedure

Design-Build

General Contractor

Gtm Bâtiment

Architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Egis (global contracting consultant), Ceef (facade technical consultant), Oikos (Pierre-Édouard Larivière) (landscape expert), Philippe Harden, Golem Images (Xavier Depaule) (renderer), Archi Graphi (movie)

BSA team

Olivier Contré (Competition and studies project manager), Philippe Vasseur (construction project manager) and Pascale Blin, Franck Courari, Julie Chevreux, Aurélie Estorge, François Gallet, Florian Ligier, Paola Lucan, Marc Girard, Garcie de Navailles, Mawari Nunez, Benoît Pinson, Bertrand Renaudin, Eric Zimmerli

Net Floor Area

74 000 sq. m

Construction cost

140 M€ w/o tax (2010 value)

Photographer

Daniel MOULINET

Selena for Artemide

Object

Completed

2015

Location
Type
Object
Status
Completed
Year
2015
Description

Design of a LED lighting product line

Client

Artemide (éditor)

Architect

Jérôme Brunet and Julien Lesieur (assistant)

Victor Dupouy Hospital - Construction of the M. Brès building

France, Argenteuil

Healthcare

Completed

2013

Location
France, Argenteuil
Type
Healthcare
Status
Completed
Year
2013
Program

Encompasses all healthcare activities contributing to patient care for various surgical and oncology specialties (outpatient consultations, operating rooms, ambulatory surgery and anesthesia unit, day hospital for chemotherapy, inpatient units), including a multidisciplinary medical intensive care unit. Capacity of 152 beds and places.

Client

Centre Hospitalier d’Argenteuil

Procedure

Design-Build

General Contractor

Gtm/Cbc Bâtiment, Cadolto

Architect

Brunet Saunier & Associés

Partner architects

Gerold Zimmerli, Jean-Luc Leroy

Partners team

Egis (technical services consultant), Mazet & Associés (construction economist)

BSA team

Marc Chassin (competition project manager), Cedric Baelde (studies and construction project manager) and Frédéric Alligorides, Simon Berger, Camille Besuelle, Dragomir Denkov, Pierre-Emmanuel Fieschi, Karine Grimaux, David Joseph, Florian Ligier, Paola Lucan, Yann-Frédéric Marie, Anthony Molles, Mawari Nunez, Agnès Plumet, Bertrand Renaudin, Michel Roux-Dorlut

Net Floor Area

19 600 sq. m

Construction cost

53 M€ w/o VAT (2013 value)

Cellar of Domaine Breton

France, Restigné

Commercial/Industry

Stopped

2012

Location
France, Restigné
Type
Commercial/Industry
Status
Stopped
Year
2012
Program

Storage spaces, reception, tasting and sales areas

Client

Catherine et Pierre Breton

Procedure

Private order

Lead architect

Brunet Saunier & Associés

BSA team

Bertrand Renaudin (project manager)

Net Floor Area

380 sq. m

Construction cost

0,4 M€ w/o VAT (2011 value)

Eastern Paris Grand Hospital

France, Marne-la-Vallée

Healthcare

Completed

2012

Location
France, Marne-la-Vallée
Type
Healthcare
Status
Completed
Year
2012
Program

Medical Surgical Obstetrical unit, psychiatry, and logistics center.
Capacity : 485 beds.

Client

Centre Hospitalier de Marne-la-Vallée

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Terrell (structure technical consultant), Arcora (facade technical consultant), Artelia (fluids technical consultant), S’pace Environnement (HEQ consultant), Talbot (construction economist), Cial (acoustics expert), Péna & Peña (landscape expert), Locomotion (Laurence Guichard) (signage designer), Philippe Harden, Golem Images (Xavier Depaule) (renderer), Alpha Volumes (model maker)

BSA team

Olivier Contré (competition and studies project manager), Christian Chopin (construction project manager) and Xavier Alfonsi, Frédéric Alligorides, Valérian Amalric, Chacha Atallah, Cédric Baelde, Pascale Blin, Mauve Esteoule-Sibilli, Jürgen Fallert, François Gallet, Karine Grimaux, Estelle Grosberg, Philippe Harden, Zeina Khawam, Mathilde Le Reste, Jérôme Levifve, Ana Markovic, Monika Mittermeyer, Franck Murat, Julie Rosier, Phuong Pham Hoang, Michel Roux-Dorlut, Mounia Saïah, Nicolas Senly, Laurence Sou, Isabelle Vasseur

Net Floor Area

72 000 sq. m

Construction cost

158 M€ w/o tax (2012 value)

Photographer

11h45

Award

2013 Equerre d’Argent Award Nominee

Elica

Object

Completed

2011

Location
Type
Object
Status
Completed
Year
2011
Description

Door handles product line

Client

PBA (editor)

BSA team

Bertrand Renaudin

Sainte-Musse Hospital

France, Toulon

Healthcare

Completed

2011

Location
France, Toulon
Type
Healthcare
Status
Completed
Year
2011
Program

Medicine, Surgery and Obstetric, psychiatry, administrative building.
Capacity: 850 beds and places

Client

Centre Hospitalier Intercommunal de Toulon-La Seyne-sur-Mer, DDE du Var (assistance à la maîtrise d’ouvrage)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Unite d’architecture – UA

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (technical services consultant et construction economist), Ceef (facade technical consultant), Logik (OPC), Pelagos (helipad consultant), Delphi (acoustics expert), Péna & Peña (landscape expert), Philippe Harden, Artefactory (renderer), Alpha Volumes (model maker)

BSA team

Olivier Contré (project manager) and Frédéric Alligorides, Abdelhafid Bairi, Yvan Bourgeois, Arnaud Bruyelle, Philippe Carol, Fiona Copstick, Stéphane Cachat, Mauve Esteoule-Sibilli, Jürgen Fallert, François Gallet, Estelle Grosberg, Margaret Iragui-Lejeune, Guillaume Jullian, Michal Bartek Kozielewsky, Cyrille Lambin, Philippe Ledoux, Jérôme Levifve, Stéfanie Matthys, Monika Mittermeyer, Franck Murat, Carin Nilsson-Demay, Laurent Noël, Camille Nourrit, Phuong Pham Hoang, Isabelle Redon, Julie Rosier, Michel Roux-Dorlut, Mounia Saïah, Maria ScicoloneIngala, Nicolas Senly, Isabelle Vasseur, Lydie Vega-Sanchez

Net Floor Area

85 000 sq. m

Construction cost

207 M€ w/o tax (2011 value)

Photographer

Michel Denancé

Cannes Hospital Center

France, Cannes

Healthcare

Completed

2010

Location
France, Cannes
Type
Healthcare
Status
Completed
Year
2010
Program

Technical platform, emergency department, operating theater, laboratories, maternity ward, and psychiatric unit.
Capacity: 530 beds and places, 22 operating rooms.

Client

Centre hospitalier de Cannes, ICADE (assistance à la maîtrise d’ouvrage)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Architecture Studio

Hospital consultant

Gerold Zimmerli

Partners team

Terrell (structure technical consultant), Sirr Ingénierie (fluids technical consultant), Logik (construction schedule), Talbot (construction economist), Delfphi (acoustics expert), Locomotion / Laurence Guichard (signage designer), Régine Le Couteur (furniture selection), Alpha Volumes (model maker), Artefacory, Laurent Hochberg, Vincent Lafont, Frédéric Manen, Thomas Sériès (renderers)

BSA team

Marc Chassin, Vincent Marchand (competition project managers), Philippe Vasseur assisted by Isabelle Redon (studies project manager), Philippe Vasseur assisted by Nicolas Constantin (construction project managers) and Frédéric Alligorides, Éric Bartolo, Eduardo Bonamin, Arnaud Bruyelle, Marc Chassin, Julie Doubesky, Ulisse Gnesda, David Hingamp, Margit Jahn, Jacques Lévy-Bencheton, Jean-Christophe Louis, Vincent Mégrot, Anissa Mérot, Maria Moldoveanu, Erik Mootz, Carin Nilsson-Demay, Maria-So De Noronha, Camille Nourrit, Céline Perrin, Lionel Renouf, Mounia Saïah, Marie-Hélène Torcq, Isabelle Vasseur, Anissa Ybert

Net Floor Area

60 000 sq. m

Construction cost

120 M€ w/o tax (2010 value)

Photographer

Julien Lanoo

William-Morey Hospital Center

France, Chalon-sur-Saône

Healthcare

Completed

2010

Location
France, Chalon-sur-Saône
Type
Healthcare
Status
Completed
Year
2010
Program

Medicine, Surgery and Obstetric, parking lot (1000 spaces).
Capacity: 550 beds and places

Client

Centre Hospitalier William-Morey, DDE de Saône-et-Loire (assistance à la maîtrise d’ouvrage)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Architectes Studio (project architect), Sirr Ingénierie (fluids technical consultant), Tkdes (synthesis consultant), Terrell (structure technical consultant), Ceef (facade technical consultant), Beem Ingénierie de Santé (equipment expert), Talbot (construction economist and OPC), Delphi (acoustics expert), Aere+Tribu (HEQ consultant), Sev Communication (signage designer), Philippe Harden, Jérôme Prévost, Artefactory (renderers), Alpha Volumes (model maker)

BSA team

Olivier Contré (competition project manager), Mounia Saïah (studies project manager), Florence Canal (construction project manager) and Yvan Bourgeois, Stéphane Cachat, Mauve Esteoule-Sibilli, François Gallet, Estelle Grosberg, Philippe Ledoux, Stéfanie Matthys, Franck Murat, Laurent Noël, Phuong Pham Hoang, Isabelle Redon, Michel Roux-Dorlut, Nicolas Senly, Isabelle Vasseur

Net Floor Area

73 000 sq. m

Construction cost

170 M€ w/o tax (2010 value)

Photographers

11h45 and Michel Denancé

Saint-Christophe Space

France, Tourcoing

Commercial/Industry

Completed

2010

Location
France, Tourcoing
Type
Commercial/Industry
Status
Completed
Year
2010
Program

Shopping centre, offices, cinema complex, 800 parking spaces

Client

SNC Alta Tourcoing, Ville de Tourcoing, SEM Ville Renouvelée

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Terrell (structure technical consultant), Serted (fluids technical consultant), Arcora (facade technical consultant), Économie 95 (construction economist), Delphi (acoustics expert), Les Éclairagistes Associés (lighting expert), Artefactory, Frédéric Manen, Jérôme Prévost (renderers and movie), Alpha Volumes et Michel Goudin (model maker)

BSA team

Marc Chassin (studies project manager), Agnès Plumet (construction project manager) and Yvan Bourgeois, Anne Carcelen, Martin Fougeras, François Gallet, Estelle Grosberg, Delphine Lottin, Elena Martinez-Caraballo, Stéfanie Matthys, Anissa Mérot, Alix Papertian, Lionel Renouf, Maria Scicolone-Ingala, Magdalena Sroczynska, Élodie Vadepied, Lydie Vega-Sanchez

Net Floor Area

35 000 sq. m

Construction cost

43 M€ w/o tax (2010 value)

Photographer

Michel DENANCE

Haute-Vienne Department Hotel

France, Limoges

Cultural/Institutional

Completed

2010

Location
France, Limoges
Type
Cultural/Institutional
Status
Completed
Year
2010
Program

Rehabilitation and extension of a 18th century listed building to accommodate the services of the General Council: offices, commission rooms and council, parking

Client

Conseil Général de la Haute-Vienne

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Brs Architectes ingénieurs (Vincent Mégrot)

Partners team

Ar&C (structure technical consultant), Inex (fluids technical consultant), Slh (power technical consultant), Aei (construction economist), Cicad (OPC), Peutz & Associés (acoustics expert), Comptoir des projets (landscape expert)

BSA team

Vincent Marchand (project manager)

Net Floor Area

16 600 sq. m (offices), 3 900 sq. m (car park)

Construction cost

27,8 M€ w/o tax (2010 value)

Photographer

Roland Halbe

Aftercare and Rehabilitation Center for Children and Teenagers (ESEAN)

France, Nantes

Healthcare

Completed

2009

Location
France, Nantes
Type
Healthcare
Status
Completed
Year
2009
Program

Technical platform with rooms for physical therapy, occupational therapy and water therapy, rooms for check-ups and treatments, and places to stay.
Capacity : 85 beds and spaces

Client

Fédération d’associations du secteur sanitaire et social (FASSS).
Établissement sanitaire pour enfants et adolescents de la région nantaise (ESEAN)

Procedure

Direct Order Purchase

Lead architect

Brunet Saunier & Associés

Partners team

Ecsb, Cert (BET structure), Ab Ingénierie (BET fluides), Gousset (économiste de la construction), Dbacoustic (acousticien), Artefactory, Vincent Lafont (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Astrid Beem (project manager) and Frédéric Alligorides, Cédric Baelde, Franck Courari, Marine Leconte, Jérôme Levifve, Isabelle Redon

Net Floor Area

7 000 sq. m

Construction cost

13 M€ w/o VAT (2009 value)

Photographer

Philippe Ruault

Douai Hospital Center

France, Douai

Healthcare

Completed

2009

Location
France, Douai
Type
Healthcare
Status
Completed
Year
2009
Program

Medicine, surgery, obstetrics department with a comprehensive technical platform, operating block, imaging facilities, maternity ward, 24-station hemodialysis unit, orthopedic surgery, and 40,000 sq. m of outdoor space. Capacity : 524 beds and spaces, 11 operating rooms

Client

Centre Hospitalier de Douai

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (technical services consultant & construction economist), Ceef (facade technical consultant), Delphi (acoustics expert), Tribu (HEQ consultant), Artefactory, Xavier Beddock, Cendrine Bonami-Redler, Philippe Harden, Frédéric Manen (renderers)

BSA team

Olivier Contré (competition, APS project manager), Christian Chopin (studies and construction project manager) and Abdelhafid Bairi, Astrid Beem, Catherine Bonnier, Yvan Bourgeois, Arnaud Bruyelle, Florence Canal, Fiona Copstick, Julie Doubesky, Jürgen Fallert, Karine Grimaux, David Hingamp, Michal Bartek Kozielewsky, Jacques Lévy-Bencheton, Vincent Mégrot, Maria-So De Noronha, Camille Nourrit, Ghislaine Picard, Lionel Renouf, Lydie Vega-Sanchez, Maria Scicolone-Ingala, Magdalena Sroczynska, Angela Tandura

Net Floor Area

65 000 sq. m

Construction cost

110 M€ w/o tax (2009 value)

Photographer

Michel Denancé and Yves Marchand & Romain Meffre

Award

2009 Equerre d’Argent Award nominee

François-Rabelais Hospital Extension

France, Chinon

Healthcare

Completed

2009

Location
France, Chinon
Type
Healthcare
Status
Completed
Year
2009
Program

Redevelopment of the François Rabelais site

Client

Centre Hospitalier du Chinonais and SCIC Nantes

Net Floor Area

21 000 sq. m

La Colombière Hospital

France, Montpellier

Healthcare

Completed

2009

Location
France, Montpellier
Type
Healthcare
Status
Completed
Year
2009
Program

Reconstruction of the adult psychiatry unit.
Capacity : 220 beds and spaces.

Client

Centre Hospitalier Régional Universitaire de Montpellier

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier Architecture

Partners team

Sirr Ingénierie, Illkirch (technical services consultant and economist), Tkdes, Bischheim (synthesis consultant), Delphi (acoustics expert), Artefactory (renderer), Alpha Volume (model maker)

BSA team

Samuel Delmas (competition project manager), Christophe Kuntz and Guillaume Jullian (studies project manager) Guillaume Jullian (construction project manager) and Maryline Gillois, Jérôme Levifve, Monika Mittermeyer, Maria Moldoveanu, Xavier Perret, Mounia Saïah, Derk Sichtermann, Isabelle Vasseur

Net Floor Area

20 000 sq. m

Construction cost

32 M€ w/o tax (2008 value)

Photographer

Michel DENANCE

Le Carat

France, Lyon

Commercial/Industry

Completed

2009

Location
France, Lyon
Type
Commercial/Industry
Status
Completed
Year
2009
Program

Offices and underground car park

Client

SCI Lyon – Thiers represented by Icade Tertial Régions

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Arcoba (technical services consultant and construction economist), Arcoba (facade technical consultant), Getci (construction economist), Philippe Harden, Golem Images (Xavier Depaule) (renderers)

BSA team

Marc Chassin assisted by Delphine Lottin, and Astrid Beem (project managers), Elena Martinez-Caraballo, Stéfanie Matthys, Phuong Pham Hoang, Agnès Plumet, Élodie Vadepied

Net Floor Area

15 000 sq. m

Construction cost

26,5 M€ w/o tax (2009 value)

Photographer

Éric Sempé

Vision Institute, Quinze-Vingt

France, Paris

Healthcare

Completed

2008

Location
France, Paris
Type
Healthcare
Status
Completed
Year
2008
Program

Laboratories, pet store and business incubator, tertiary building, 26-room service residence

Client

Caisse des Dépôts et Consignations and Icade

Procedure

Public Private Partnership (PPP)

General Contractor

Rabot-Dutilleul

Architect

Brunet Saunier & Associés

Partners team

Icade Arcoba (construction economist), Van Santen & Associés (facade technical consultant), Icade Eurogem (maintainer), Icade Eurostudiomes (residence manager), Péna & Peña (landscape expert), Artefactory, Philippe Harden (renderers), Alpha Volumes (model maker)

BSA team

Stéphane Cachat and Christian Chopin (competition project managers), Stéphane Cachat assisted by Cyril Pressacco, (studies and construction project managers) and Frédéric Alligorides, Abdelhafid Bairi, Jacques Lévy-Bencheton, Franck Jaoui, Jérôme Levifve, Hoang Phuong Pham, Xiaojing Lu, Ana Markovic, Monika Mittermeyer, Laurent Noël, Maria-So De Noronha, Michel Roux-Dorlut, Nicolas Senly, Isabelle Vasseur

Net Floor Area

11 400 sq. m

Construction cost

24 M € w/o tax (2008 value)

Photographers

Yves Marchand & Romain Meffre

Regional Institute for Biotherapy Research

France, Montpellier

Research/Teaching

Completed

2008

Location
France, Montpellier
Type
Research/Teaching
Status
Completed
Year
2008
Program

Redesign of the biotherapy research institute

Client

Centre Hospitalier Universitaire de Montpellier

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie, Illkirch (engineering consultant and economist), Delphi, Villiers-sur-Marne (acoustics expert), Frédéric Manen et Artefactory (renderers), Alpha Volume (model maker)

BSA team

Marc Chassin (competition project manager), Guillaume Jullian (studies and construction project manager) and Astrid Beem, Yvan Bourgeois, Samuel Delmas, Maryline Gillois, David Hingamp, Christophe Kuntz, Jérôme Levifve, Lindsay-Ann Martin, Monica Mittermayer, Maria Moldoveanu, Xavier Perret, Mounia Saïah, Derk Sichtermann, Isabelle Vasseur

Net Floor Area

7 600 sq. m

Construction cost

17 M€ w/o tax

Photographer

Éric Sempé

High School of Engineers and Technicians for Agriculture (ESITPA)

France, Mont-Saint-Aignan

Research/Teaching

Completed

2007

Location
France, Mont-Saint-Aignan
Type
Research/Teaching
Status
Completed
Year
2007
Program

Research laboratories, teaching rooms, amphitheatres

Client

Assemblée permanente des Chambres d’Agriculture (APCA)

Lead architect

Brunet Saunier & Associés

Partner architect

Brs Architectes ingénieurs

Partners team

Sechaud & Bossuyt (technical services consultant), Reber (construction economist), Peutz & Associés (acoustics expert), Projet Base (landscape expert)

BSA team

Vincent Marchand (project manager)

Net Floor Area

12 500 sq. m

Construction cost

17 M€ w/o VAT (2007 value)

Photographer

Roland Halbe

Arc-en-Ciel Siemens

France, Saint-Denis

Commercial/Industry

Completed

2006

Location
France, Saint-Denis
Type
Commercial/Industry
Status
Completed
Year
2006
Program

Offices, conference centre, restaurant

Client

Siemens, UBS Real Estate Kapitalanlagegesellschaft mbH

Procedure

Direct order purchase

Lead architect

Brunet Saunier & Associés

Partners team

Terrell (structure technical consultant), Bethac (fluids technical consultant), Vulcaneo (fire safety consultant), Paul Pieffet (construction economist), Delphi (acoustics expert), Laure Quoniam (landscape expert), Philippe Harden et Artefactory (renderers)

BSA team

Astrid Beem (project manager) and Frédéric Alligorides, Yvan Bourgeois, Florence Canal, Samuel Delmas, Claudia Dieling, Martin Fougeras, Maxime Gasperini, Jean-Michel Reynier, Maria Scicolone-Ingala, Derk Sichtermann, Isabelle Vasseur, Lydie Vega-Sanchez, Anissa Ybert

Net Floor Area

37 000 sq. m

Construction cost

60 M€ w/o tax (2006 value)

Photographer

Jean-Marie MONTHIERS

Louis-Pierquin Center

France, Nancy

Healthcare

Completed

2006

Location
France, Nancy
Type
Healthcare
Status
Completed
Year
2006
Program

Technical rehabilitation platform with cardiovascular reconditioning, balneotherapy, and specialized rehabilitation.
Capacity: 135 beds and places.

Client

UGECAM Nord-Est

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Atelier du Parc (project architect), Sirr Ingénierie (technical services consultant and construction economist), Delphi (acoustics expert), L-Design (Pipo Lionni et Arik Lévy) (signage designer), Artefactory, Laurent Hochberg, Julien Lomessy, Frédéric Manen, Thomas Sériès (renderers)

BSA team

Marc Chassin (project manager) and Éric Bartolo, Astrid Beem,Catherine Bonnier, Yvan Bourgeois, Stéphane Cachat, Samuel Delmas, Tugay Dindar, Ludovic Forest, Jacques Lévy-Bencheton, Anissa Mérot, Lionel Renouf, Isabelle Vasseur

Net Floor Area

22 000 sq. m

Construction cost

29 M€ w/o VAT (2006 value)

Photographer

Jean-Marie Monthiers

Award

2007 Equerre d’Argent Award nominee

1/2

Saint-Sabin Nursery

France, Paris

Institutional/Infrastructural

Completed

2005

Location
France, Paris
Type
Institutional/Infrastructural
Status
Completed
Year
2005
Program

Construction of a 60-place nursery

Client

Ville de Paris

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Reims Logipole

France, Reims

Commercial/Industry

Completed

2004

Location
France, Reims
Type
Commercial/Industry
Status
Completed
Year
2004
Client

Reims University Hospital

Procedure

Design-Build

General Contractor

Rabot-Dutilleul Construction

Architect

Brunet Saunier & Associés

Net Floor Area

21 730 sq. m

Construction cost

33,8 M€ w/o tax (2006 value)

Clocheville Pediatric Hospital Renovation

France, Tours

Healthcare

Completed

2003

Location
France, Tours
Type
Healthcare
Status
Completed
Year
2003
Client

University Hospital of Tours

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partner architect

Ivars & Ballet

Partners team

Sodeteg (engineering consultant)

Net Floor Area

1 500 sq. m

Construction cost

13,6 M€ w/o tax

Multimedia Documentary Ressource Center

France, Paris

Cultural/Institutional

Completed

2002

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
2002
Client

Ministère de l’Emploi et de la Solidarité

Lead architect

Brunet Saunier & Associés

Partners team

Sfica (BET), Alto (BET verrière), Aei (économiste), Vincent Lafont (perspectiviste)

BSA team

Jean-Michel Reynier (competition and APS project manager), Christophe Kuntz (studies project manager), Philippe Vasseur (construction project manager) and Jacques Lévy-Bencheton, Vincent Mégrot, Camille Nourrit, Lionel Renou

Net Floor Area

4 000 sq. m

Construction cost

6,1 M€ w/o VAT (2002 value)

Arthur-Honegger Conservatory

France, Le Havre

Cultural/Institutional

Completed

2002

Location
France, Le Havre
Type
Cultural/Institutional
Status
Completed
Year
2002
Program

National School of Music, Dance and Dramatic Art

Client

Ville du Havre

Lead architect

Brunet Saunier & Associés

Partners team

Terrell international (structure technical consultant), Bethac (fluids technical consultant), Philippe Talbot & Associés (economist), Cial (acoustics expert), Changement à Vue (scenographer), Philippe Harden (renderer)

BSA team

Jean-Michel Reynier (competition and APS project manager), Jean François Bourdet (studies project manager), Isabelle Vasseur (construction project manager) and Jacques Lévy-Bencheton, Lionel Renouf

Net Floor Area

8 600 sq. m

Construction cost

10 M€ w/o VAT (2002 value)

Dramatic Art School, Paul-Valéry University

France, Montpellier

Cultural/Institutional

Completed

2002

Location
France, Montpellier
Type
Cultural/Institutional
Status
Completed
Year
2002
Program

Construction of the School of Dramatic Art, 250-seat theatre, 300-seat amphitheatre, classrooms, offices

Client

Rectorat de l’Académie de Montpellier

Lead architect

Brunet Saunier & Associés

Partners team

C+D Architecture (Nicolas Crégut, Sonia Larzillière) (project architect), Beterem (technical services consultant and OPC)

BSA team

Christophe Kuntz (studies project manager) and Vincent Mégrot, Jean-Michel Reynier

Net Floor Area

6 000 sq. m

Construction cost

4,6 M€ w/o VAT (2002 value)

ADEME Headquarters

France, Angers

Commercial/Industry

Stopped

2002

Location
France, Angers
Type
Commercial/Industry
Status
Stopped
Year
2002
Client

Agence de l’Environnement et de la Maîtrise de l’Energie

Lead architect

Brunet Saunier & Associés

Net Floor Area

10 500 sq. m

Construction cost

12 M€ w/o tax (1999 value)

Town Hall parking

France, Chalon-sur-Saône

Infrastructural

Completed

2001

Location
France, Chalon-sur-Saône
Type
Infrastructural
Status
Completed
Year
2001

Main Hall Rehabilitation, Paris Dauphine University

France, Paris

Research/Teaching

Completed

2001

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
2001

Residential building Rue de Flandre

France, Paris

Residential

Completed

1999

Location
France, Paris
Type
Residential
Status
Completed
Year
1999
Program

55 social housing units

Client

Office Public d’Aménagement et de Construction (OPAC) de Paris

Lead architect

Brunet Saunier & Associés

Partners team

Oth (technical services consultant), Didier Ghislain (renderer)

BSA team

Isabelle Vasseur (project manager), Jean-Michel Reynier

Net Floor Area

5 200 sq. m

Construction cost

4 M€ w/o VAT (1995 value)

Saint-Pierre Institute

France, Palavas-Les-Flots

Healthcare

Completed

1999

Location
France, Palavas-Les-Flots
Type
Healthcare
Status
Completed
Year
1999
Program

Rehabilitation and construction of a new building including 155 beds, technical platform, accommodation, balneotherapy, rehabilitation, audiology, radiology, walking track, kitchen, dining, 10 classrooms.

Client

Œuvre Montpelliéraine des Enfants à la Mer (OMEM)

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Jacobs (technical services consultant and construction economist), Péna & Peña (landscape expert), Sabine Rosant (signage designer)

BSA team

Jean-Michel Reynier (competition and studies project manager), Christophe Kuntz (construction project manager) and Jacques Lévy-Bencheton, Federico Masotto, Lionel Renouf

Net Floor Area

13 000 sq. m

Construction cost

15,2 M€ w/o tax (1999 value)

Photographer

Jean-Marie MONTHIERS

Val de Rennes Central command post, garage and workshops

France, Rennes

Commercial/Industry

Completed

1999

Location
France, Rennes
Type
Commercial/Industry
Status
Completed
Year
1999

Prefabricated buildings, Jussieu Campus

France, Paris

Research/Teaching

Completed

1998

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1998

Rescue center

France, Le Blanc-Mesnil

Healthcare

Completed

1998

Location
France, Le Blanc-Mesnil
Type
Healthcare
Status
Completed
Year
1998

Paris Rive Gauche building

France, Paris

Residential

Completed

1997

Location
France, Paris
Type
Residential
Status
Completed
Year
1997
Program

95 social housing units, 3 levels of underground parking, retail spaces at ground level

Client

La Sablière

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Geciba (structure technical consultant), Bethac (fluids technical consultant), Talbot (construction economist), Vincent Lafont (renderer), David Topani (model maker)

BSA team

Vincent Marchand (competition project manager), Jean-Michel Reynier (studies project manager), Isabelle Vasseur (construction project manager) and Bach Nguyen, Valérie Faugeras, Frederico Masotto, Vincent Mégrot, George Yiontis

Net Floor Area

9 700 sq. m

Construction cost

8,5 M€ w/o tax (1996 value)

Photographer

Jean-Marie MONTHIERS

Banque de France Regional Headquarters

France, Montpellier

Cultural/Institutional

Completed

1996

Location
France, Montpellier
Type
Cultural/Institutional
Status
Completed
Year
1996
Client

Banque de France, direction de l’immobilier

Mandatory architect

Brunet Saunier Architecture

Partners team

Jean-Louis Besnard (facade technical consultant), Jean-Pierre Aury (concrete consultant), Serete (engineering consultant), Valérie Faugeras (furniture), Anne & Denis Cleary (renderers), Gatimalau (artistic intervention)

BSA team

Christophe Kuntz, Bach Nguyen, George Yiontis, Jacques Lévy-Bencheton

Address

98 ter avenue de Lodève 34000 Montpellier

Built surface

6 500 m²

Construction cost

11 M € w/o VAT (1996 value)

Administrative center

France, Saint-Germain-en-Laye

Cultural/Institutional

Completed

1995

Location
France, Saint-Germain-en-Laye
Type
Cultural/Institutional
Status
Completed
Year
1995
Program

Public reception facilities, administrative and technical services offices

Client

Ville de Saint-Germain-en-Laye

Procedure

Public Procurement (MOP law)

Lead architect

Brunet Saunier & Associés

Partners team

Oth (technical services consultant), Alto (Marc Malinowsky) (glass consultant), Vincent Lafont (renderer)

BSA team

Igor Demidoff (competition project manager), Jean-Michel Reynier (studies project manager) and Isabelle Vasseur (construction project manager)

Net Floor Area

7 000 sq. m (offices), 4 000 sq. m (car park)

Construction cost

8,7 M€ w/o tax (1995 value)

Photographer

Jean-Marie MONTHIERS, Clément GUILLAUME

Music and Dance School

France, Chalon-sur-Saône

Research/Teaching

Completed

1995

Location
France, Chalon-sur-Saône
Type
Research/Teaching
Status
Completed
Year
1995

St-Germain-en-Laye International High School

France, St-Germain-en-Laye

Research/Teaching

Completed

1995

Location
France, St-Germain-en-Laye
Type
Research/Teaching
Status
Completed
Year
1995

Renault Technocentre

France, Guyancourt

Commercial/Industry

Completed

1995

Location
France, Guyancourt
Type
Commercial/Industry
Status
Completed
Year
1995

Cacharel Nîmes

France, Nîmes

Commercial/Industry

Completed

1994

Location
France, Nîmes
Type
Commercial/Industry
Status
Completed
Year
1994

Research laboratories of Musées de France in Le Louvres

France, Paris

Research/Teaching

Completed

1994

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1994
Programme

Underground laboratories beneath the Tuileries garden

Client

Établissement public du Grand Louvre

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (technical services consultant), Pierre Focqué (glass structure consultant), François Robin, Vincent Lafont (renderers)

BSA team

François Guidon (competition project manager), Isabelle Vasseur (construction project manager), Valérie Faugeras (furniture)

Address

Passage des Lions de l’aile de Flore, Palais du Louvre 75001 Paris

Built surface

5 500 m²

Construction cost

7 M € w/o VAT (1994 value)

Le Sou medical

France, Paris

Commercial/Industry

Completed

1994

Location
France, Paris
Type
Commercial/Industry
Status
Completed
Year
1994

Tax Center

France, Flers

Cultural/Institutional

Completed

1993

Location
France, Flers
Type
Cultural/Institutional
Status
Completed
Year
1993

“100 years of housing” Exhibition, Pavilion de l’Arsenal

France, Paris

Cultural/Institutional

Completed

1993

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
1993

Louis Debré Foundation

France, Ernée

Cultural/Institutional

Completed

1993

Location
France, Ernée
Type
Cultural/Institutional
Status
Completed
Year
1993

La Tour des Dames High School

France, Rozay-en-Brie

Research/Teaching

Completed

1993

Location
France, Rozay-en-Brie
Type
Research/Teaching
Status
Completed
Year
1993

Police Station of Créteil

France, Créteil

Cultural/Institutional

Completed

1992

Location
France, Créteil
Type
Cultural/Institutional
Status
Completed
Year
1992
Programme

Police departmental services

Client

Ministère de l’Intérieur

Mandatory architect

Brunet Saunier Architecture

Partners team

Serete (engineering consultant), Marc Malinovsky (glass consultant), François Morellet (artistic intervention)

BSA team

Jean-Michel Reynier (project manager), Eric Dufour, Vitorio Pisu, Patricia Feraru with Jérôme Delage and Fernand Tsaropoulos

Address

Boulevard Jean Baptiste Oudry 94000 Créteil

Built surface

30 000 m²

Construction cost

19,3 M € w/o VAT (1992 value)

Gymnasium on rue des Rigoles

France, Paris

Cultural/Institutional

Completed

1992

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
1992

Industrial Building

France, Paris

Commercial/Industry

Completed

1991

Location
France, Paris
Type
Commercial/Industry
Status
Completed
Year
1991

Mines Télécom School

France, Paris

Research/Teaching

Completed

1991

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1991

Placettes School

France, Nîmes

Research/Teaching

Completed

1991

Location
France, Nîmes
Type
Research/Teaching
Status
Completed
Year
1991

IUT of Lieusaint

France, Lieusaint

Research/Teaching

Completed

1991

Location
France, Lieusaint
Type
Research/Teaching
Status
Completed
Year
1991

Prefecture of Mayenne

France, Laval

Cultural/Institutional

Completed

1991

Location
France, Laval
Type
Cultural/Institutional
Status
Completed
Year
1991
Programme

Public reception services of the Prefecture

Client

Ministère de l’Intérieur

Mandatory architect

Brunet Saunier Architecture

Partners team

Projetud (engineering consultant), Louis Debré (artistic intervention)

BSA team

Jean Marie Parant, Eric Cugnart (competition), Jean-Paul Roynette (studies and construction)

Address

56 rue Mazagran 53000 Laval

Built surface

2 800 m²

Hérouville Saint-Clair Police Station

France, Hérouville Saint-Clair

Cultural/Institutional

Completed

1990

Location
France, Hérouville Saint-Clair
Type
Cultural/Institutional
Status
Completed
Year
1990
Programme

Central police station, offices and security rooms

Client

Secrétariat général pour l’administration de la police (SGAP) de Rennes

Mandatory architect

Brunet Saunier Architecture

Partners team

Patrick Guevel (économist), Eric Chicaez (model maker)

BSA team

Philippe Vasseur (project manager)

Address

Avenue de la Valeuse 14200 Hérouville Saint-Clair

Built surface

1 200 m²

Construction cost

0,8 M € w/o VAT (1990 value)

Savies square residential building

France, Paris

Residential

Completed

1990

Location
France, Paris
Type
Residential
Status
Completed
Year
1990
Programme

90 housing units on Rue des Savies and 18 housing units on Rue de la Mare

Client

Office Public d’Aménagement et de Construction (OPAC) de Paris

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (technical services consultant)

BSA team

Isabelle Vasseur et Philippe Vasseur (project managers)

Address

37-57 rue de la Mare et 2-8 rue de Savies 75020 Paris

Built surface

13 000 m²

Cylinder house “The smallest tower in Europe”

France, Hérouville Saint-Clair

Residential

Completed

1990

Location
France, Hérouville Saint-Clair
Type
Residential
Status
Completed
Year
1990

Residential Building on Rue de la Marne

France, Paris

Residential

Completed

1989

Location
France, Paris
Type
Residential
Status
Completed
Year
1989

Prêt de la Manche Departmental Library

France, Saint-Lô

Cultural/Institutional

Completed

1988

Location
France, Saint-Lô
Type
Cultural/Institutional
Status
Completed
Year
1988

Superintendent of Schools

France, Hérouville Saint-Clair

Cultural/Institutional

Completed

1988

Location
France, Hérouville Saint-Clair
Type
Cultural/Institutional
Status
Completed
Year
1988

Telecommunications center

France, Flers

Cultural/Institutional

Completed

1986

Location
France, Flers
Type
Cultural/Institutional
Status
Completed
Year
1986

Gymnasium

France, Combs-la-Ville

Cultural/Institutional

Completed

1986

Location
France, Combs-la-Ville
Type
Cultural/Institutional
Status
Completed
Year
1986