Project

Location

Type

Status

Year

Rothschild Foundation Hospital

France, Paris

Healthcare

Ongoing

2025

Location
France, Paris
Type
Healthcare
Status
Ongoing
Year
2025
Programme

Grand Paris Express train station, line 14 South

Client

Fondation Ophtalmologique A. de Rothschild

Mandatory architect

Brunet Saunier Architecture

Partners team

Ingérop (engineering), Us&Co (construction economist), Ingérop (acoustics), Diapason médiation (mediation), Cicad (phasing), Playtime (perspectivist)

BSA team

Clément Billaquois (project leader), Charles Bazzaz, Franck Courari, Hugo Viellard, Gerold Zimmerli

Procedure

Loi MOP

Address

29 Rue Manin 75019 Paris

Built surface

12 500 m²

La Broye Intercantonal Hospital

Switzerland, Payerne

Healthcare

Ongoing

2025

Location
Switzerland, Payerne
Type
Healthcare
Status
Ongoing
Year
2025
Programme

Extension and restructuration of Payerne’s Hopsital: operating room, intensive care, maternity, hospitalization, consultations, day hospitals

Client

Hôpital Intercantonal de la Broye

Mandatory architect

Brunet Saunier Architecture

Partner architect

Architram

Hospital consultant

Dr Kareem Boulos

Partners team

Bg Ingenieurs Conseils (Engineering), Playtime (perspectivists)

BSA team

Franck Courari (project leader), Hugo Viellard

Procedure

MEP (Mandat d’étude parallèle)

Address

Avenue de la Colline 3 1530 Payerne (Suisse)

Built surface

19 500 m²

Construction cost

60 M € HT (value 2019)

Algiers University Hospital Center

Algeria, Algiers

Healthcare

Ongoing

2024

Location
Algeria, Algiers
Type
Healthcare
Status
Ongoing
Year
2024
Hospital consultant

Gerold Zimmerli

Partners team

By-Encore (perspectiviste)

BSA team

Nicolas Senly (chef de projet), David Tessier, Marie-Ange Monthiers, Magdalena Sroczynska, Eric Zimmerli, François Gallet, Hugo Viellard, Frédéric Alligoridès, Charles Bazzaz, Isabelle Vasseur, Corto Troude

Building companies

Cscec/Betomn

MIN Porte de Thiais Station, City of gastronomy

France, Chevilly-Larue

Infrastructural

Ongoing

2024

Location
France, Chevilly-Larue
Type
Infrastructural
Status
Ongoing
Year
2024
Programme

Grand Paris Express train station, line 14 South

Client

RATP

Mandatory architect

Brunet Saunier Architecture (Groupement Elios)

Partners team

Setec Tpi (BET TCE mandataire), Sodecset (économiste de la construction), Kahle Acoustics (acousticien), Light Cible (éclairagiste), Setec Bâtiment (préventionniste), Renderstorm (perspectivistes)

BSA team

Nicolas Senly (chef de projet)

Address

Rue de Thiais 94550 Chevilly-Larue

Procedure

Loi MOP

Built surface

4 500 m²

1/2

Interventional and Surgical Center

France, Rennes

Healthcare

Ongoing

2023

Location
France, Rennes
Type
Healthcare
Status
Ongoing
Year
2023
Programme

Outpatient center with 60 seats, duplex operating room with 55 rooms, 108 beds of critical surgical care, 240 beds of conventional surgical accommodation

Client

CHU de Rennes

Mandatory architect

Brunet Saunier Architecture

Partners team

Edeis (Engineering), Fl Conseil (logistics consultant), Sertco (structure), Gpl Expert (digital hospital consultant), Sigma Acoustique (acoustics), Armor Ingénierie (SSI), Franck Boutté Consultants (environment), Cegelec (Electricity), Pelagos Aéro (helipad), R2m (economist), Philippe Villien (urban planner), Luxigon/Arte Factory/By Encore (perspectivists), Fred Manen/Graphic’images Nantes (film)

BSA team

Garcie de Navailles (chef de projet), Franck Courari, Thomas Giroud, Clément Billaquois, Charles Bazzaz, Eric Zimmerli, Gerold Zimmerli

Building companies

Sogéa Bretagne Btp/Vinci Construction

Procedure

Conception-Réalisation

Address

2 Rue Henri le Guilloux 35000 Rennes

Built surface

50 400 m²

Construction cost

136 M € HT (value 2019)

Meilahti Trauma and Cancer Centre

Finland, Helsinki

Healthcare

Construction

2022

Location
Finland, Helsinki
Type
Healthcare
Status
Construction
Year
2022
Programme

Trauma and Cancer centre

Client

Hospital District of Helsinki and Uusimaa (HUS)

Mandatory architect

AW2 Architects/Architecture Workshop Finland Ltd

Partner architect

Brunet Saunier Architecture, B&M Architecture Ltd, Harris – Kjisik Ltd

Hospital consultant

Gerold Zimmerli

Partners team

A-insinöörit Ltd (BET structure), Consortium Granlund-Ramboll (BET energie et fluides), Akukon Ltd (acousticien)

BSA team

Lassi Mustonen (Paris), Hanna Tjukanov (Helsinki), Julien Mortet (Helsinki)

Procedure

Équivalent Loi MOP

Built surface

69 000 m²

Construction cost

230 M € HT (valeur 2015)

Photographs

Tuomas Uusheimo

Martinique University Hospital Cyclotron

France, Fort-de-France

Healthcare

Ongoing

2022

Location
France, Fort-de-France
Type
Healthcare
Status
Ongoing
Year
2022
Hospital consultant

Gerold Zimmerli

Partners team

Edeis (BET fluides), Hauss (BET structure), Playtime (perspectivistes)

BSA team

Hugo Viellard (chef de projet), Eric Zimmerli, Marie-Ange Monthiers, Charles Bazzaz, Michel Roux-Dorlut, François Gallet

Building companies

Sogéa Martinique/Tunzini Antilles

Procedure

Conception-Réalisation

Issy Station

France, Issy-les-Moulineaux

Infrastructural

Construction

2022

Location
France, Issy-les-Moulineaux
Type
Infrastructural
Status
Construction
Year
2022
Programme

Grand Paris Express train station, line 15

Client

Société du Grand Paris

Mandatory architect

Brunet Saunier Architecture

Partners team

Setec Tpi/Ingerop (BET TCE mandataire), Ingerop (économiste de la construction), Avls (acousticien), Arcora (façades), Vulcaneo (préventionniste), Renderstorm (perspectivistes), New-tone (maquettiste)

BSA team

Isabelle Vasseur (chef de projet), Cédric Baelde, Charles Bazzaz

Procedure

Loi MOP

Address

Place Léon Blum 92130 Issy-les-Moulineaux

Built surface

6 000 m²

Construction cost

125 M € HT (valeur 2014)

1/6

Sambre Avesnois Hospital Center

France, Maubeuge

Healthcare

Construction

2021

Location
France, Maubeuge
Type
Healthcare
Status
Construction
Year
2021
Programme

Medicine, Surgery, Gynecology-Obstetrics (MCO), 265 beds

Client

Centre hospitalier de Sambre Avesnois

Mandatory architect

Brunet Saunier Architecture

Partners team

Montaron (entreprise VRD), Wsp (BET), Etamine (BET HQE), Labanq (perspectivistes), Vectuel (film), Bauraum (maquettiste)

BSA team

Franck Courari (chef de projet), Charles Bazzaz, François Gallet, Garcie de Navailles, Vasiliki Noula, David Tessier

Entreprise

Bouygues Bâtiment Nord-Est (mandataire)

Procedure

Conception-Réalisation

Address

6 Chemin des Rocailles 59600 Maubeuge

Built surface

33 000 m²

Construction cost

66 M € HT (valeur 2016)

1/9

Lariboisière New Hospital

France, Paris

Healthcare

Construction

2021

Location
France, Paris
Type
Healthcare
Status
Construction
Year
2021
Programme

Construction of two new buildings and restructuring of part of the historic hospital

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Mandatory architect

Brunet Saunier Architecture

Partner architect

Bernard Desmoulin

Hospital consultant

Gerold Zimmerli

Partners team

Snc – Lavalin (fluids, elevators, transport, plumbing, HVAC), Tpfi (demolition, structure, VRD, OPC, acoustics), Alto (HQE), Ae 75 (construction economist), Bassinet et Turquin (landscape designer), Fl Conseil (logistics consultant), Kresterion (digital hospital consultant), By-Encore (perspectivists), ArchiGraphi (film), Bauraum (model maker)

BSA team

Pierre Parquet (competition project leader), David Tessier, Jérémy Toumine, Corto Troude, Feissal Benkhelifa

Procedure

Loi MOP

Address

2 Rue Ambroise Paré 75010 Paris

Built surface

54 000 m²

Construction cost

118 M € HT (value 2016)

Lariboisière New Hospital, New Morax

France, Paris

Healthcare

Construction

2021

Location
France, Paris
Type
Healthcare
Status
Construction
Year
2021
Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Mandatory architect

Brunet Saunier Architecture

BSA team

Competition : Pierre Parquet (project leader), David Tessier, Jérémy Toumine, Corto Troude, Feissal Benkhelifa
Studies : Philippe Vasseur (project director), Mauve Esteoule-Sibili (project leader), David Tessier, Magdalena Sroczynska, Florian Arrivault, Celine Chambost, Marie-Ange Monthiers

Hospital consultant

Gerold Zimmerli

Partner architect

Bernard Desmoulin

Address

2 Rue Ambroise Paré 75010 Paris

Procedure

Loi MOP

Built surface

5246 m² SDO

Team

EDEIS (fluids, elevators, transport, plumbing, HVAC), Tpfi (demolition, structure, VRD, OPC, acoustics), Alto (HQE engineering), AE 75 (construction economist), Bassinet et Turquin (Landscape architect, competition), élémenTerre-paysages (landscape designer), Fl Conseil (logistics consultant), Kresterion (digital hospital consultant), By-Encore (perspectivists), ArchiGraphi (film), Bauraum (model maker)

Photographer

11h45

Meaux Saint-Faron Hospital Center

France, Meaux

Healthcare

Competition

2020

Location
France, Meaux
Type
Healthcare
Status
Competition
Year
2020
Client

Grand Hôpital de l’Est Francilien (GHEF)

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Ingerop (BET TCE), Us&Co (économiste de la construction), Alto (BET HQE), Cicad (OPC), Sigma acoustique (acousticien), Elementerre (paysagiste), By-Encore (perspectivistes), Bauraum (maquettiste)

BSA team

Hugo Viellard (chef de projet), François Gallet, Marie-Ange Monthiers, Eric Zimmerli, Michel Roux-Dorlut, Corto Troude

Procedure

Loi MOP

Address

6-8 Saint-Fiacre 77100 Meaux

Built surface

46 000 m²

Construction cost

84 M € HT (valeur 2020)

Extension of the Sud Seine et Marne Hospital Center

France, Fontainebleau

Healthcare

Completed

2020

Location
France, Fontainebleau
Type
Healthcare
Status
Completed
Year
2020
Programme

1 technical tray (5 operating rooms, imaging, 10 UHTCD-Very Short Hospital Unit beds, 10 beds in intensive care and 6 beds in continuous supervision), 3 hospitalization units (2 units with 30 beds in medicine and 1 unit with 30 beds in surgery), 50 day hospital beds (medicine and surgery)

Client

Centre Hospitalier Sud Seine-et-Marne

Mandatory architect

Brunet Saunier Architecture

Partner architect

François Jestaz

Partners team

Bg Ingenieurs Conseils (BET TCE), Peb (économiste de la construction), Acoustique et Conseils (acousticien), Eléments Ingénieries (BET HQE), Frédérique Garnier (paysagiste), Renderstorm (perspectiviste)

BSA team

Mounia Saïah (chef de projet), Magdalena Sroczynska, Corto Troude

Building companies

Inso Spo (mandataire) Etablissement Hanny

Procedure

Conception-Réalisation

Address

55 Boulevard du Maréchal Joffre 77300 Fontainebleau

Built surface

15 000 m²

Construction cost

34 M € HT (valeur 2016)

Henri Mondor Hospital, Reine Building

France, Créteil

Healthcare

Completed

2020

Location
France, Créteil
Type
Healthcare
Status
Completed
Year
2020
Programme

21 room operating theatre, Post-Interventional Monitoring Room (SSPI) and 85 critical care beds connected to the existing hospital tower

Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

Mandatory architect

Brunet Saunier Architecture

Partners team

Wsp (BET TCE), Us&Co (économiste de la construction), Sigma acoustique (acousticien), Casso et associés (préventionniste), Eodd (BET HQE), Fl Conseil (consultant logistique), Golem (perspectivistes)

BSA team

Olivier Contré, François Gallet, Franck Courari, Clément Billaquois

Building companies

Rabot Dutilleuil Construction (mandataire)

Procedure

Conception-Réalisation

Address

51 Avenue du Maréchal de Lattre de Tassigny 94000 Créteil

Built surface

13 800 m²

Construction cost

38 M € HT (valeur 2016)

Grand Paris Nord University Hospital

France, Saint-Ouen

Healthcare

Competition

2020

Location
France, Saint-Ouen
Type
Healthcare
Status
Competition
Year
2020
Client

Assistance Publique – Hôpitaux de Paris (AP-HP)

BSA team

Franck Courari (project leader), Maria Leopizzi, Corto Troude, Garcie de Navailles, Gerold Zimmerli, Hugo Viellard, Sara Adimi, Mounia Saïah, David Tessier

Partner architect

Renzo Piano Building Workshop

Photographs

Michel Denancé (model)

Jules Bordet New Institute

Belgique, Bruxelles

Healthcare

Completed

2020

Location
Belgique, Bruxelles
Type
Healthcare
Status
Completed
Year
2020
Programme

Reconstruction of the cancer centre on the site of the Université libre de Bruxelles (ULB) with integrated cancer research laboratories, 8 operating rooms, 250 hospital beds and 40 day hospital beds

Client

Institut Jules Bordet, AAMR (assistance à la maîtrise d’ouvrage)

Mandatory architect

Brunet Saunier Architecture

Partner architect

Archi 2000

Hospital consultant

Gerold Zimmerli

Partners team

Tpf Group (BET TCE), Emmer-Pfenninger (BET façades), Apor (micro-implantation), Golem Images (Xavier Depaule), Philippe Harden, Frédéric Manen (perspectivistes), Alpha-Volumes (maquettiste)

BSA team

Mauve Estéoule-Sibilli (chef de projet PRO2 à Chantier), Charles Bazzaz, Jürgen Fallert et Astrid Beem (chef de projet Concours à PRO1), Frédéric Alligorides, Cédric Baelde, Simon Berger, Florence Canal, Marie Chaumaz, Franck Courari, Aurélie Estorges, Myrtille Fakhreddine, Marine Leconte, Delphine Lottin, Mawari Nunez, Isabelle Redon, Julie Rosier, Mounia Saiah, Nicolas Senly, Magdalena Sroczynska, Isabelle Vasseur

Address

Rue Meylemeersch 58-70 1070 Anderlecht (Belgique)

Built surface

80 000 m²

Construction cost

161 M€ HT (valeur 2019)

Photographs

Jeroen Verrecht

Condorcet Campus

France, Aubervilliers

Research/Teaching

Completed

2019

Location
France, Aubervilliers
Type
Research/Teaching
Status
Completed
Year
2019
Programme

Urban planning for the campus “City of humanities and social science”, research and training building, university restoration spaces and underground parking

Client

Établissement Public de Coopération Scientifique (EPCS), Campus Condorcet

Mandatory architect

Brunet Saunier Architecture, avec Agence TER (landscape and urban planner, coordinators), Antonini Darmon Architectes, Jean-Baptiste Lacoudre Architectures, K architectures, Jean-Christophe Quinton Architecte

Partners team

Wsp (engineering), Oasiis (HQE), Quidort (kitchen engineering), Betip (VRD)

BSA team

Olivier Contré (directeur de projet), Florian Ligier (chef de projet), Charles Bazzaz, Hugo Viellard, Antonin Eyssette, Pierre-Emmanuel Fieschi, Antoine Kersse, Benoit Pinson, Joana Skendi, David Tessier, Corto Troude

Building companies

Gtm Bâtiment (mandatory), Adim Concepts (real estate developer), Cofely Services (exploitation/maintenance)

Procedure

Partenariat Public Privé (PPP)

Address

17 Rue Waldeck Rochet 93300 Aubervilliers

Built surface

15 500 m²

Photographs

11h45

National Hospital of Obstetrics and Gynecology

Vietnam, Hanoï

Healthcare

Ongoing

2019

Location
Vietnam, Hanoï
Type
Healthcare
Status
Ongoing
Year
2019
Programme

New building on the site of the “National Hospital of Obstetrics and Gynecology” with 200 hospitalization beds, 1 operating room with 4 rooms, 1 delivery room, 1 neonatal intensive care unit, 1 emergency department and consultations

Client

Le Delta

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Vncc (Vietnam National Construction Consultants Corporation) (partenaire local)

BSA team

Hugo Viellard (chef de projet), Franck Courari

Procedure

Commande directe

Address

43 Tràng Thi, Quận Hoàn Kiếm, Hanoi (Vietnam)

Built surface

13 650 m²

Laboratories Paris-Est Créteil University

France, Créteil

Research/Teaching

Competition

2019

Location
France, Créteil
Type
Research/Teaching
Status
Competition
Year
2019

Mother-Child Unit of the Sens Hospital Center

France, Sens

Healthcare

Competition

2019

Location
France, Sens
Type
Healthcare
Status
Competition
Year
2019

I.Ceram Factory

France, Limoges

Commercial/Industry

Competition

2019

Location
France, Limoges
Type
Commercial/Industry
Status
Competition
Year
2019
Client

I.Ceram

Mandatory architect

Brunet Saunier Architecture

BSA team

Hugo Viellard (chef de projet), François Gallet

Procedure

Concours privé

Building Boulevard Davout

France, Paris

Residential

Competition

2018

Location
France, Paris
Type
Residential
Status
Competition
Year
2018

Office building, ZAC Cambacérès

France, Montpellier

Commercial/Industry

Competition

2018

Location
France, Montpellier
Type
Commercial/Industry
Status
Competition
Year
2018

INSEAD, Campus Europe

France, Fontainebleau

Research/Teaching

Stopped

2018

Location
France, Fontainebleau
Type
Research/Teaching
Status
Stopped
Year
2018
Client

INSEAD, The Business School for the World

Mandatory architect

Brunet Saunier Architecture

Partners team

Bg ingénieurs (BET TCE), Charpente Concept (BET structure bois), Vpeas (économiste de la construction), Sigma (acousticien), Ter (paysagiste), Arwytec (cuisiniste), Lm Ingéniérie (consultant audiovisuel), Labank (perspectivistes), Bauraum (maquettiste)

BSA team

Garcie De Navailles-Labatut (chef de Projet), Florian Arrivault, Clément Billaquois, Thomas Giroud, Antoine Maréchal, Victoria Seux, Hugo Viellard

Procedure

Concours privé

Address

Boulevard de Constance 77300 Fontainebleau

Built surface

19 500 m²

Construction cost

49 M € HT (valeur 2018)

New Limmattal Hospital

Switzerland, Zurich

Healthcare

Completed

2018

Location
Switzerland, Zurich
Type
Healthcare
Status
Completed
Year
2018
Programme

200 beds

Client

Spitalverband Limmattal

Mandatory architect

Brunet Saunier Architecture

Partner architect

Bfb Architekten

Hospital consultant

Gerold Zimmerli

Partners team

Losinger Marazzi (entreprise mandataire), Emmer Pfenninger Partner Ag (BET façades), Bg Ingenieure und Berater Ag (BET structure), Hans Abicht Ag (BET CVC), Bösch Ag (BET Sanitaire), Eproplan Ag et Scherler Ag (BET electricité), Gartenmann Ag (BET physique du bâtiment), Mibag (BET facility Management), Gesswein Landschaftsarchitekten (paysagiste), Golem Images (perspectivistes), Archigraphie (vidéo)

BSA team

Caspar Muschalek (chef de projet) et Mauve Esteoule-Sibilli, Jürgen Fallert, Kristina Ilieva, Magdalena Sroczynska, Frédéric Alligoridès (BIM-Manager)

Procedure

Conception construction avec l’entreprise Losinger Marazzi

Address

Urdorferstrasse 100 8952 Schlieren (Suisse)

Built surface

48 500 m²

Construction cost

150 M CHF HT (valeur 2014)

Trousseau New Hospital

France, Tours

Healthcare

Competition

2018

Location
France, Tours
Type
Healthcare
Status
Competition
Year
2018

Paradise Masters

Object

Completed

2018

Location
Type
Object
Status
Completed
Year
2018
Mandatory architect

Jerome Brunet avec Thomas Monet 

Partners team

Plume de Paris (artisan plumassier)

Caen Hospital Center Reconstruction

France, Caen

Healthcare

Competition

2018

Location
France, Caen
Type
Healthcare
Status
Competition
Year
2018

Nord Franche-Comté Hospital

France, Trévenans

Healthcare

Completed

2016

Location
France, Trévenans
Type
Healthcare
Status
Completed
Year
2016
Programme

772 beds

Client

Centre Hospitalier de Belfort-Montbéliard

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (Engineering and construction economist), Ceef (facades), Tribu (HQE), Delphi, Cial (Acoustics), Péna & Peña, Oikos (landscape designers), Encore Heureux, Golem Images, Philippe Harden (perspectivists), Alpha Volumes (model maker)

BSA team

Olivier Contré (chef de projet concours et études), Philippe Vasseur (chef de projet chantier) et Frédéric Alligorides, Giulio Avventi, Cedric Baelde, Charles Bazzaz, Pascale Blin, Franck Courari, Mauve Esteoule-Sibilli, Jürgen Fallert, Myrtille Fakhreddine, François Gallet, Karine Grimaux, Phuong Pham Hoang, Marine Leconte, Florian Ligier, Garcie de Navailles, Julie Rosier, Michel Roux-Dorlut, Mounia Saïah, Laurence Sou

Partner architect

Serge Gaussin & Associés

Address

100 Route de Moval 90400 Trévenans

Built surface

74 000 m²

Construction cost

168 M € HT (value 2012)

HUG, Gustave Juillard Building

Switzerland, Genève

Healthcare

Completed

2016

Location
Switzerland, Genève
Type
Healthcare
Status
Completed
Year
2016
Programme

Second bed building, extension of the hospital and redevelopment of public space, 6 operating theaters, 420 beds, 12 intensive care rooms, 40 continuing care beds

Client

République et canton de Genève, Département des Finances (DF)

Mandatory architect

Brunet Saunier Architecture, Odile Seyler et Jacques Lucan, Gerold Zimmerli

Partner architect

Burckhardt+Partner

Partners team

Burckhardt+Partner (économiste de la construction), Thomas Jundt ingenieurs civils (BET structure), Emmer Pfenninger (BET façades), Tecnoservice Engineering (Patrice Anstett) (BET fluides), Frédéric Manen, Golem Images (Xavier Depaule) (perspectivistes)

BSA team

Astrid Beem (chef de projet) et Frédéric Alligorides, Simon Berger, Franck Courari, Jürgen Fallert, Chloé Giroud, Karine Grimaux, Léonard Gurtner, Renaud Marret, Mawari Nunez, Magdalena Sroczynska, Stéphane Zimmerli

Address

Rue Alcide-Jentzer 17 1205 Genève, Suisse

Built surface

41 000 m²

Construction cost

140 M € HT (valeur 2010)

Photographer

Thomas Jantscher

Pôle Ecotox

France, Alixan-Valence

Research/Teaching

Completed

2016

Location
France, Alixan-Valence
Type
Research/Teaching
Status
Completed
Year
2016
Programme

Platform for research and expertise in environmental toxicology and ecotoxicity

Client

Drôme Aménagement Habitat, Rovaltain Research Company (user)

Mandatory architect

Brunet Saunier Architecture

Partners team

Agc Concept Architectes (operation architects), Rfr Sas (structure), Cet ingénierie (fluids), Elements Ingénieries (HQE), Cap Horn Solutions (acoustics), Mazet & Associés (economist), Ixans (OPC), Bureau Alpes Contrôles (controle), Bureau Veritas (SPS coordinator), Oikos (landscape designer), Golem Images (perspectivists)

BSA team

Bertrand Renaudin (project leader), Charles Bazzaz, Jürgen Fallert, Florian Ligier, Daniel Otero, Pierre Parquet, Joana Skendi, David Tessier

Address

2 Rue René Truhaut 26300 Alixan

Built surface

12 670 m², 10 000 m² exterior spaces

Construction cost

30,2 M € HT (value 2014)

Metropole Savoie Hospital Center

France, Chambéry

Healthcare

Completed

2015

Location
France, Chambéry
Type
Healthcare
Status
Completed
Year
2015
Programme

771 beds

Client

Centre Hospitalier de Chambéry

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Egis (BET TCE), Ceef (BET façades), Oikos (Pierre-Édouard Larivière) (paysagiste), Philippe Harden, Golem Images (Xavier Depaule) (perspectivistes), Archi Graphi (vidéo)

BSA team

Olivier Contré (chef de projet concours et études), Philippe Vasseur (chef de projet chantier) et Charles Bazzaz, Pascale Blin, Franck Courari, Julie Chevreux, Aurélie Estorge, François Gallet, Florian Ligier, Paola Lucan, Marc Girard, Garcie de Navailles, Mawari Nunez, Benoît Pinson, Bertrand Renaudin, Eric Zimmerli

Building companies

Gtm Bâtiment

Procedure

Conception-Réalisation

Address

Place Lucien Biset 73000 Chambéry

Built surface

74 000 m²

Construction cost

140 M € HT (valeur 2010)

Photographer

?

Selena for Artemide

Object

Completed

2015

Location
Type
Object
Status
Completed
Year
2015
Programme

Design of a LED lighting product line

Client

Artemide (éditeur)

Mandatory architect

Jérôme Brunet et Julien Lesieur (assistant)

Victor-Dupouy Hospital Center

France, Argenteuil

Healthcare

Completed

2013

Location
France, Argenteuil
Type
Healthcare
Status
Completed
Year
2013
Programme

Reconstruction of short-stay activities in modular, 562 beds

Client

Centre Hospitalier d’Argenteuil

Mandatory architect

Brunet Saunier Architecture

Partner architect

Gerold Zimmerli, Jean-Luc Leroy

Partners team

Egis (BET TCE), Mazet & Associés (économiste de la construction)

BSA team

Marc Chassin (chef de projet concours), Cedric Baelde (chef de projet études et chantier) et Frédéric Alligorides, Simon Berger, Camille Besuelle, Dragomir Denkov, Pierre-Emmanuel Fieschi, Karine Grimaux, David Joseph, Florian Ligier, Paola Lucan, Yann-Frédéric Marie, Anthony Molles, Mawari Nunez, Agnès Plumet, Bertrand Renaudin, Michel Roux-Dorlut

Building companies

Gtm/Cbc Bâtiment, Cadolto

Procedure

Conception-Réalisation

Address

69 Rue du Lieutenant Colonel Prudhon 95107 Argenteuil

Built surface

62 000 m²

Construction cost

137 M € HT (valeur 2009)

Cellar of Domaine Breton

France, Restigné

Commercial/Industry

Stopped

2012

Location
France, Restigné
Type
Commercial/Industry
Status
Stopped
Year
2012
Programme

Storage spaces, reception, tasting and sales areas

Client

Catherine et Pierre Breton

Mandatory architect

Brunet Saunier Architecture

BSA team

Bertrand Renaudin (chef de projet)

Address

Route du Peu Muleau 37140 Restigné

Built surface

380 m²

Construction cost

0,4 M € HT (valeur 2011)

Eastern Paris Grand Hospital

France, Marne-la-Vallée

Healthcare

Completed

2012

Location
France, Marne-la-Vallée
Type
Healthcare
Status
Completed
Year
2012
Programme

460 MCO beds and 125 psychiatric beds et logipôle

Client

Centre Hospitalier de Marne-la-Vallée

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Terrell (BET structure), Arcora (BET façades), Artelia (BET fluides), S’pace Environnement (BET HQE), Talbot (économiste de la construction), Cial (acousticien), Péna & Peña (paysagiste), Locomotion (Laurence Guichard) (Concepteur signalétique), Philippe Harden, Golem Images (Xavier Depaule) (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Olivier Contré (chef de projet concours et études), Christian Chopin (chef de projet chantier) et Xavier Alfonsi, Frédéric Alligorides, Valérian Amalric, Chacha Atallah, Cédric Baelde, Charles Bazzaz, Pascale Blin, Mauve Esteoule-Sibilli, Jürgen Fallert, François Gallet, Karine Grimaux, Estelle Grosberg, Philippe Harden, Zeina Khawam, Mathilde Le Reste, Jérôme Levifve, Ana Markovic, Monika Mittermeyer, Franck Murat, Julie Rosier, Phuong Pham Hoang, Michel Roux-Dorlut, Mounia Saïah, Nicolas Senly, Laurence Sou, Isabelle Vasseur

Address

Cours de la Gondoire 77600 Jossigny

Built surface

72 000 m²

Construction cost

158 M € HT (valeur 2012)

Photographer

11h45

Elica

Object

Completed

2011

Location
Type
Object
Status
Completed
Year
2011
Programme

Door handles product line

Client

PBA (éditeur)

BSA team

Bertrand Renaudin

Sainte-Musse Hospital

France, Toulon

Healthcare

Completed

2011

Location
France, Toulon
Type
Healthcare
Status
Completed
Year
2011
Programme

850 beds

Client

Centre Hospitalier Intercommunal de Toulon-La Seyne-sur-Mer, DDE du Var (assistance à la maîtrise d’ouvrage)

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (BET et économiste de la construction), Ceef (BET façades), Logik (OPC), Pelagos (consultant hélistation), Delphi (acousticien), Péna & Peña (paysagiste), Philippe Harden, Artefactory (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Olivier Contré (chef de projet) et Frédéric Alligorides, Charles Bazzaz, Abdelhafid Bairi, Yvan Bourgeois, Arnaud Bruyelle, Philippe Carol, Fiona Copstick, Stéphane Cachat, Mauve Esteoule-Sibilli, Jürgen Fallert, François Gallet, Estelle Grosberg, Margaret Iragui-Lejeune, Guillaume Jullian, Michal Bartek Kozielewsky, Cyrille Lambin, Philippe Ledoux, Jérôme Levifve, Stéfanie Matthys, Monika Mittermeyer, Franck Murat, Carin Nilsson-Demay, Laurent Noël, Camille Nourrit, Phuong Pham Hoang, Isabelle Redon, Julie Rosier, Michel Roux-Dorlut, Mounia Saïah, Maria ScicoloneIngala, Nicolas Senly, Isabelle Vasseur, Lydie Vega-Sanchez

Partner architect

Unite d’architecture – UA

Address

54 Rue Henri Sainte-Claire Deville 83100 Toulon

Built surface

85 000 m²

Construction cost

207 M € HT (valeur 2011)

Photographer

Michel Denancé

Cannes Hospital Center

France, Cannes

Healthcare

Completed

2010

Location
France, Cannes
Type
Healthcare
Status
Completed
Year
2010
Programme

530 beds, complete technical platform and laboratories, maternity, psychiatry, emergencies, 22 operating rooms

Client

Centre hospitalier de Cannes, ICADE (assistance à la maîtrise d’ouvrage)

Mandatory architect

Brunet Saunier Architecture

Partner architect

Architecture Studio

Hospital consultant

Gerold Zimmerli

Partners team

Terrell (BET structure), Sirr Ingénierie (BET fluides), Logik (OPC), Talbot (économiste de la construction), Delfphi (acousticien), Locomotion / Laurence Guichard (concepteur signalétique), Régine Le Couteur (sélection mobilier), Alpha Volumes (maquettiste), Artefacory, Laurent Hochberg, Vincent Lafont, Frédéric Manen, Thomas Sériès (perspectivistes)

BSA team

Marc Chassin, Vincent Marchand (chefs de projet concours), Philippe Vasseur assisté d’Isabelle Redon (chefs de projet études), Philippe Vasseur assisté de Nicolas Constantin (chefs de projet chantier) et Frédéric Alligorides, Éric Bartolo, Eduardo Bonamin, Arnaud Bruyelle, Marc Chassin, Julie Doubesky, Ulisse Gnesda, David Hingamp, Margit Jahn, Jacques Lévy-Bencheton, Jean-Christophe Louis, Vincent Mégrot, Anissa Mérot, Maria Moldoveanu, Erik Mootz, Carin Nilsson-Demay, Maria-So De Noronha, Camille Nourrit, Céline Perrin, Lionel Renouf, Mounia Saïah, Marie-Hélène Torcq, Isabelle Vasseur, Anissa Ybert

Address

15 avenue des Broussailles 06400 Cannes

Built surface

60 000 m²

Construction cost

120 M € HT (valeur 2010)

Photographer

Julien Lanoo

William-Morey Hospital Center

France, Chalon-sur-Saône

Healthcare

Completed

2010

Location
France, Chalon-sur-Saône
Type
Healthcare
Status
Completed
Year
2010
Programme

550 beds, 1 000 parking spaces

Client

Centre Hospitalier William-Morey, DDE de Saône-et-Loire (assistance à la maîtrise d’ouvrage)

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Architectes Studio (architecte d’opération), Sirr Ingénierie (BET fluides), Tkdes (BET Synthèse), Terrell (BET structure), Ceef (BET façades), Beem Ingénierie de Santé (équipementier), Talbot (économiste de la construction et OPC), Delphi (acousticien), Aere+Tribu (BET HQE), Sev Communication (Concepteur signalétique), Philippe Harden, Jérôme Prévost, Artefactory (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Olivier Contré (chef de projet concours), Mounia Saïah (chef de projet études), Florence Canal (chef de projet chantier) et Charles Bazzaz, Yvan Bourgeois, Stéphane Cachat, Mauve Esteoule-Sibilli, François Gallet, Estelle Grosberg, Philippe Ledoux, Stéfanie Matthys, Franck Murat, Laurent Noël, Phuong Pham Hoang, Isabelle Redon, Michel Roux-Dorlut, Nicolas Senly, Isabelle Vasseur

Address

4 Rue Capitaine Drillien 71321 Chalon-sur-Saône

Built surface

73 000 m²

Construction cost

170 M € HT (valeur 2010)

Photographer

11h45 et Michel Denancé

Saint-Christophe Space

France, Tourcoing

Commercial/Industry

Completed

2010

Location
France, Tourcoing
Type
Commercial/Industry
Status
Completed
Year
2010
Programme

Shopping centre, offices, cinema complex, 800 parking spaces

Client

SNC Alta Tourcoing, Ville de Tourcoing, SEM Ville Renouvelée

Mandatory architect

Brunet Saunier Architecture

Partners team

Terrell (BET structure), Serted (BET fluides), Arcora (BET façades), Économie 95 (économiste de la construction), Delphi (acousticien), Les Éclairagistes Associés (éclairagiste), Artefactory, Frédéric Manen, Jérôme Prévost (perspectivistes et vidéo), Alpha Volumes et Michel Goudin (maquettiste)

BSA team

Marc Chassin (chef de projet études), Agnès Plumet (chef de projet chantier) et Yvan Bourgeois, Anne Carcelen, Martin Fougeras, François Gallet, Estelle Grosberg, Delphine Lottin, Elena Martinez-Caraballo, Stéfanie Matthys, Anissa Mérot, Alix Papertian, Lionel Renouf, Maria Scicolone-Ingala, Magdalena Sroczynska, Élodie Vadepied, Lydie Vega-Sanchez

Address

Place de la république 59200 Tourcoing

Built surface

35 000 m²

Construction cost

43 M € HT (valeur 2010)

Photographer

?

Haute-Vienne Department Hotel

France, Limoges

Cultural/Institutional

Completed

2010

Location
France, Limoges
Type
Cultural/Institutional
Status
Completed
Year
2010
Programme

Rehabilitation and extension of a 18th century listed building to accommodate the services of the General Council: offices, commission rooms and council, parking

Client

Conseil général de la Haute-Vienne

Mandatory architect

Brunet Saunier Architecture

Partner architect

Brs Architectes ingénieurs (Vincent Mégrot)

Partners team

Ar&C (BET structure), Inex (BET fluides), Slh (BET électricité), Aei (économiste de la construction), Cicad (OPC), Peutz & Associés (acousticien), Comptoir des projets (paysagiste)

BSA team

Vincent Marchand (chef de projet)

Address

11 Rue François Chénieux 87000 Limoges

Built surface

16 600 m² (bureaux), 3 900 m² (parking)

Construction cost

27,8 M € HT (valeur 2010)

Photographer

Roland Halbe

Aftercare and Rehabilitation Center for Children and Teenagers (ESEAN)

France, Nantes

Healthcare

Completed

2009

Location
France, Nantes
Type
Healthcare
Status
Completed
Year
2009
Programme

55 beds and 30 places in day hospital, technical tray with physiotherapy, occupational therapy and balneotherapy rooms, consultation or examination and care rooms, signage

Client

Fédération d’associations du secteur sanitaire et social (FASSS), Établissement sanitaire pour enfants et adolescents de la région nantaise (ESEAN), APOR (assistance à la maîtrise d’ouvrage)

Mandatory architect

Brunet Saunier Architecture

Partners team

Ecsb, Cert (BET structure), Ab Ingénierie (BET fluides), Gousset (économiste de la construction), Dbacoustic (acousticien), Artefactory, Vincent Lafont (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Astrid Beem (chef de projet) et Frédéric Alligorides, Cédric Baelde, Franck Courari, Marine Leconte, Jérôme Levifve, Isabelle Redon

Address

58 Rue des Bourdonnières 44200 Nantes

Built surface

7 000 m²

Construction cost

13 M € HT (valeur 2009)

Douai Hospital Center

France, Douai

Healthcare

Completed

2009

Location
France, Douai
Type
Healthcare
Status
Completed
Year
2009
Programme

500 beds of obstetric surgery medicine, complete technical tray, 11 operating rooms, 10 radio rooms, birth area, hemodialysis 24 stations, bone surgery and 40,000 m² of outdoor spaces

Client

Centre Hospitalier de Douai, DDE du Nord (conducteur d’opération)

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie (BET TCE et économiste de la construction), Ceef (BET façades), Delphi (acousticien), Tribu (BET HQE), Artefactory, Xavier Beddock, Cendrine Bonami-Redler, Philippe Harden, Frédéric Manen (perspectivistes)

BSA team

Olivier Contré (chef de projet concours, APS), Christian Chopin (chef de projet études et chantier) et Abdelhafid Bairi, Astrid Beem, Catherine Bonnier, Yvan Bourgeois, Arnaud Bruyelle, Florence Canal, Fiona Copstick, Julie Doubesky, Jürgen Fallert, Karine Grimaux, David Hingamp, Michal Bartek Kozielewsky, Jacques Lévy-Bencheton, Vincent Mégrot, Maria-So De Noronha, Camille Nourrit, Ghislaine Picard, Lionel Renouf, Lydie Vega-Sanchez, Maria Scicolone-Ingala, Magdalena Sroczynska, Angela Tandura

Address

Rue de Cambrai 59507 Douai

Built surface

65 000 m²

Construction cost

110 M € HT (valeur 2009)

Photographer

Michel Denancé et Yves Marchand & Romain Meffre

François-Rabelais Hospital Extension

France, Chinon

Healthcare

Completed

2009

Location
France, Chinon
Type
Healthcare
Status
Completed
Year
2009

La Colombière Hospital

France, Montpellier

Healthcare

Completed

2009

Location
France, Montpellier
Type
Healthcare
Status
Completed
Year
2009
Programme

Reconstruction of adult psychiatry with 220 beds

Client

Centre Hospitalier Régional Universitaire de Montpellier

Mandatory architect

Brunet Saunier Architecture

Partners team

Sirr Ingénierie, Illkirch (BET et économiste), Tkdes, Bischheim (BET Synthèse), Delphi (acousticien), Artefactory (perspectivistes), Alpha Volume (maquettiste)

BSA team

Samuel Delmas (chef de projet concours), Christophe Kuntz et Guillaume Jullian (chefs de projet études) Guillaume Jullian (chef de projet chantier) et Maryline Gillois, Jérôme Levifve, Monika Mittermeyer, Maria Moldoveanu, Xavier Perret, Mounia Saïah, Derk Sichtermann, Isabelle Vasseur

Address

39 Avenue Charles Flahault 34090 Montpellier

Built surface

20 000 m²

Construction cost

32 M € HT (valeur 2008)

Le Carat

France, Lyon

Commercial/Industry

Completed

2009

Location
France, Lyon
Type
Commercial/Industry
Status
Completed
Year
2009
Programme

Offices and underground car park

Client

SCI Lyon – Thiers représentée par Icade Tertial Régions

Mandatory architect

Brunet Saunier Architecture

Partners team

Arcoba (BET TCE et économiste de la construction), Arcoba (BET façades), Getci (économiste de la construction), Philippe Harden, Golem Images (Xavier Depaule) (perspectivistes)

BSA team

Marc Chassin assisté de Delphine Lottin, et Astrid Beem (chefs de projet), Elena Martinez-Caraballo, Stéfanie Matthys, Phuong Pham Hoang, Agnès Plumet, Élodie Vadepied

Address

Rue Michel Rambaud 69006 Lyon

Built surface

15 000 m²

Construction cost

26,5 M € HT (valeur 2009)

Photographer

Éric Sempé

Vision Institute, Quinze-Vingt

France, Paris

Healthcare

Completed

2008

Location
France, Paris
Type
Healthcare
Status
Completed
Year
2008
Programme

Laboratories, pet store and business incubator, tertiary building, 26-room service residence

Client

Caisse des Dépôts et Consignations et Icade

Mandatory architect

Brunet Saunier Architecture

Partners team

Icade Arcoba (économiste de la construction), Van Santen & Associés (BET façades), Icade Eurogem (mainteneur), Icade Eurostudiomes (gestionnaire résidence), Péna & Peña (paysagiste), Artefactory, Philippe Harden (perspectivistes), Alpha Volumes (maquettiste)

BSA team

Stéphane Cachat et Christian Chopin (chefs de projet concours), Stéphane Cachat assisté de Cyril Pressacco, (chefs de projet études et chantier) et Frédéric Alligorides, Abdelhafid Bairi, Jacques Lévy-Bencheton, Franck Jaoui, Jérôme Levifve, Hoang Phuong Pham, Xiaojing Lu, Ana Markovic, Monika Mittermeyer, Laurent Noël, Maria-So De Noronha, Michel Roux-Dorlut, Nicolas Senly, Isabelle Vasseur

Procedure

Participation Public Privé (PPP) avec l’entreprise mandataire Rabot-Dutilleul

Address

13-17 rue Moreau 75012 Paris

Built surface

11 400 m²

Construction cost

24 M € HT (valeur 2008)

Photographer

Yves Marchand & Romain Meffre

Regional Institute for Biotherapy Research

France, Montpellier

Research/Teaching

Completed

2008

Location
France, Montpellier
Type
Research/Teaching
Status
Completed
Year
2008
Client

Centre Hospitalier Universitaire de Montpellier

Mandatory architect

Brunet Saunier Architecture

Hospital consultant

Gerold Zimmerli

Partners team

Sirr Ingénierie, Illkirch (BET et économiste), Delphi, Villiers-sur-Marne (acousticien), Frédéric Manen et Artefactory (perspectivistes), Alpha Volume (maquettiste)

BSA team

Marc Chassin (chef de projet concours), Guillaume Jullian (chef de projet études et chantier) et Astrid Beem, Yvan Bourgeois, Samuel Delmas, Maryline Gillois, David Hingamp, Christophe Kuntz, Jérôme Levifve, Lindsay-Ann Martin, Monica Mittermayer, Maria Moldoveanu, Xavier Perret, Mounia Saïah, Derk Sichtermann, Isabelle Vasseur

Address

80 avenue Augustin Fliche 34295 Montpellier

Built surface

7 600 m²

Construction cost

17 M € HT

Photographer

Éric Sempé

Higher School of Engineers and Technicians for Agriculture (ESITPA)

France, Mont-Saint-Aignan

Research/Teaching

Completed

2007

Location
France, Mont-Saint-Aignan
Type
Research/Teaching
Status
Completed
Year
2007
Programme

Research laboratories, teaching rooms, amphitheatres

Client

Assemblée permanente des Chambres d’Agriculture (APCA)

Mandatory architect

Brunet Saunier Architecture

Partner architect

Brs Architectes ingénieurs

Partners team

Sechaud & Bossuyt (BET TCE), Reber (économiste de la construction), Peutz & Associés (acousticien), Projet Base (paysagiste)

BSA team

Vincent Marchand (chef de projet)

Address

3 Rue du Tronquet 76130 Mont-Saint-Aignan

Built surface

12 500 m²

Construction cost

17 M € HT (valeur 2007)

Arc-en-Ciel Siemens

France, Saint-Denis

Commercial/Industry

Completed

2006

Location
France, Saint-Denis
Type
Commercial/Industry
Status
Completed
Year
2006
Programme

Offices, conference centre, restaurant

Client

Siemens, UBS Real Estate Kapitalanlagegesellschaft mbH

Mandatory architect

Brunet Saunier Architecture

Partners team

Terrell (BET structure), Bethac (BET fluides), Vulcaneo (BET sécurité incendie), Paul Pieffet (économiste de la construction), Delphi (acousticien), Laure Quoniam (paysagiste), Philippe Harden et Artefactory (perspectivistes)

BSA team

Astrid Beem (chef de projet) et Frédéric Alligorides, Yvan Bourgeois, Florence Canal, Samuel Delmas, Claudia Dieling, Martin Fougeras, Maxime Gasperini, Jean-Michel Reynier, Maria Scicolone-Ingala, Derk Sichtermann, Isabelle Vasseur, Lydie Vega-Sanchez, Anissa Ybert

Procedure

Commande directe

Address

53 Boulevard Ornano 93200 Saint-Denis

Built surface

37 000 m²

Construction cost

60 M € HT (valeur 2006)

Photographer

?

Louis-Pierquin Center

France, Nancy

Healthcare

Completed

2006

Location
France, Nancy
Type
Healthcare
Status
Completed
Year
2006
Programme

115 beds and 120 day hospital places, technical rehabilitation platform with cardiovascular reconditioning, balneotherapy, specialized rehabilitation

Client

UGECAM Nord-Est

Mandatory architect

Brunet Saunier Architecture

Partners team

Atelier du Parc (architecte d’opération), Sirr Ingénierie (BET TCE et économiste de la construction), Delphi (acousticien), L-Design (Pipo Lionni et Arik Lévy) (Concepteur signalétique), Artefactory, Laurent Hochberg, Julien Lomessy, Frédéric Manen, Thomas Sériès (perspectivistes)

BSA team

Marc Chassin (chef de projet) et Éric Bartolo, Astrid Beem,Catherine Bonnier, Yvan Bourgeois, Stéphane Cachat, Samuel Delmas, Tugay Dindar, Ludovic Forest, Jacques Lévy-Bencheton, Anissa Mérot, Lionel Renouf, Isabelle Vasseur

Address

75 Boulevard Lobau 54000 Nancy

Built surface

22 000 m²

Construction cost

29 M € HT (valeur 2006)

Saint-Sabin Nursery

France, Paris

Institutional/Infrastructural

Completed

2005

Location
France, Paris
Type
Institutional/Infrastructural
Status
Completed
Year
2005

Reims Logipole

France, Reims

Commercial/Industry

Completed

2004

Location
France, Reims
Type
Commercial/Industry
Status
Completed
Year
2004

Clocheville Pediatric Hospital Renovation

France, Tours

Healthcare

Completed

2003

Location
France, Tours
Type
Healthcare
Status
Completed
Year
2003

Multimedia Documentary Resource Center

France, Paris

Cultural/Institutional

Completed

2002

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
2002
Client

Ministère de l’Emploi et de la Solidarité

Mandatory architect

Brunet Saunier Architecture

Partners team

Sfica (BET), Alto (BET verrière), Aei (économiste), Vincent Lafont (perspectiviste)

BSA team

Jean-Michel Reynier (chefs de projet concours et APS), Christophe Kuntz (chefs de projet études), Philippe Vasseur (chefs de projet chantier) et Jacques Lévy-Bencheton, Vincent Mégrot, Camille Nourrit, Lionel Renou

Address

14 avenue Duquesne 75350 Paris

Built surface

4 000 m²

Construction cost

6,1 M € HT (valeur 2002)

Arthur-Honegger Conservatory

France, Le Havre

Cultural/Institutional

Completed

2002

Location
France, Le Havre
Type
Cultural/Institutional
Status
Completed
Year
2002
Programme

National School of Music, Dance and Dramatic Art

Client

Ville du Havre

Mandatory architect

Brunet Saunier Architecture

Partners team

Terrell international (BET structure), Bethac (BET fluides), Philippe Talbot & Associés (économiste), Cial (acousticien), Changement à Vue (scénographe), Philippe Harden (perspectiviste)

BSA team

Jean-Michel Reynier (chef de projet concours, APS), Jean François Bourdet (chef de projet études), Isabelle Vasseur (chef de projet chantier) et Jacques Lévy-Bencheton, Lionel Renouf

Address

70 Cours de la République 76600 Le Havre

Built surface

8 600 m²

Construction cost

10 M € HT (valeur 2002)

Dramatic Art School, Paul-Valéry University

France, Montpellier

Cultural/Institutional

Completed

2002

Location
France, Montpellier
Type
Cultural/Institutional
Status
Completed
Year
2002
Programme

Construction of the School of Dramatic Art, 250-seat theatre, 300-seat amphitheatre, classrooms, offices

Client

Rectorat de l’Académie de Montpellier

Mandatory architect

Brunet Saunier Architecture

Partners team

C+D Architecture (Nicolas Crégut, Sonia Larzillière) (architecte d’opération), Beterem (BET TCE et OPC)

BSA team

Christophe Kuntz (chef de projet études) et Vincent Mégrot, Jean-Michel Reynier

Address

Avenue du Val de Montferrand 34199 Montpellier

Built surface

6 000 m²

Construction cost

4,6 M € HT (valeur 2002)

ADEME Headquarters

France, Angers

Commercial/Industry

Stopped

2002

Location
France, Angers
Type
Commercial/Industry
Status
Stopped
Year
2002

Town Hall parking

France, Chalon-sur-Saône

Infrastructural

Completed

2001

Location
France, Chalon-sur-Saône
Type
Infrastructural
Status
Completed
Year
2001

Main Hall Rehabilitation, Paris Dauphine University

France, Paris

Research/Teaching

Completed

2001

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
2001

Residential building Rue de Flandre

France, Paris

Residential

Completed

1999

Location
France, Paris
Type
Residential
Status
Completed
Year
1999
Programme

55 social housing units

Client

Office Public d’Aménagement et de Construction (OPAC) de Paris

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (BET TCE), Didier Ghislain (perspectiviste)

BSA team

Isabelle Vasseur (chef de projet), Jean-Michel Reynier

Address

156 avenue de Flandres 75019 Paris

Built surface

5 200 m²

Construction cost

4 M € HT (valeur 1995)

Saint-Pierre Institute

France, Palavas-Les-Flots

Healthcare

Completed

1999

Location
France, Palavas-Les-Flots
Type
Healthcare
Status
Completed
Year
1999
Programme

Renovation and construction of a new building with 155 beds, rooms, technical platform, balneotherapy, rehabilitation, audiology, radiology, walking tracks, kitchen, restaurant, 10 classrooms

Client

Œuvre Montpelliéraine des Enfants à la Mer (OMEM)

Mandatory architect

Brunet Saunier Architecture

Partners team

Jacobs (BET TCE et économiste de la construction), Péna & Peña (paysagiste), Sabine Rosant (Concepteur signalétique)

BSA team

Jean-Michel Reynier (chef de projet concours et études), Christophe Kuntz (chef de projet chantier) et Jacques Lévy-Bencheton, Federico Masotto, Lionel Renouf

Address

371 avenue de l’Évêché de Maguelone 34250 Palavas-les-Flots

Built surface

13 000 m²

Construction cost

15,2 M € HT (valeur 1999)

Photographer

?

Val de Rennes Central command post, garage and workshops

France, Rennes

Commercial/Industry

Completed

1999

Location
France, Rennes
Type
Commercial/Industry
Status
Completed
Year
1999

Prefabricated buildings, Jussieu Campus

France, Paris

Research/Teaching

Completed

1998

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1998

Rescue center

France, Le Blanc-mesnil

Healthcare

Completed

1998

Location
France, Le Blanc-mesnil
Type
Healthcare
Status
Completed
Year
1998

Paris Rive Gauche building

France, Paris

Residential

Completed

1997

Location
France, Paris
Type
Residential
Status
Completed
Year
1997
Programme

95 social housing units, 3 levels of underground parking, retail spaces at ground level

Client

La Sablière

Mandatory architect

Brunet Saunier Architecture

Partners team

Geciba (BET structure), Bethac (BET fluides), Talbot (économiste de la construction), Vincent Lafont (perspectiviste), David Topani (maquettiste)

BSA team

Vincent Marchand (chef de projet concours), Jean-Michel Reynier (chef de projet études), Isabelle Vasseur (chef de projet chantier), Bach Nguyen, Valérie Faugeras, Frederico Masotto, Vincent Mégrot, George Yiontis

Address

Rue Neuve-Tolbiac 75013 Paris

Built surface

9 700 m²

Construction cost

8,5 M € HT (valeur 1996)

Photographer

?

Banque de France Regional Headquarters

France, Montpellier

Cultural/Institutional

Completed

1996

Location
France, Montpellier
Type
Cultural/Institutional
Status
Completed
Year
1996
Client

Banque de France, direction de l’immobilier

Mandatory architect

Brunet Saunier Architecture

Partners team

Jean-Louis Besnard (consultant façade), Jean-Pierre Aury (consultant béton), Serete (BET ingénierie), Valérie Faugeras (mobilier), Anne & Denis Cleary (perspectivistes), Gatimalau (intervention artistique)

BSA team

Christophe Kuntz, Bach Nguyen, George Yiontis, Jacques Lévy-Bencheton

Address

98 ter avenue de Lodève 34000 Montpellier

Built surface

6 500 m²

Construction cost

11 M € HT (valeur 1996)

Administrative center

France, Saint-Germain-en-Laye

Cultural/Institutional

Completed

1995

Location
France, Saint-Germain-en-Laye
Type
Cultural/Institutional
Status
Completed
Year
1995
Programme

Public reception facilities, administrative and technical services offices

Client

Ville de Saint-Germain-en-Laye

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (BET TCE), Alto (Marc Malinowsky) (consultant verrière), Vincent Lafont (perspectiviste)

BSA team

Igor Demidoff (chef de projet concours), Jean-Michel Reynier (chef de projet études), Isabelle Vasseur (chef de projet chantier)

Address

Rue Léon-Desoyer 78100 Saint Germain-en-Laye

Built surface

7 000 m² (bureaux), 4 000 m² (parking)

Construction cost

8,7 M € HT (valeur 1995)

Photographer

?

Music and Dance School

France, Chalon-sur-Saône

Research/Teaching

Completed

1995

Location
France, Chalon-sur-Saône
Type
Research/Teaching
Status
Completed
Year
1995

St-Germain-en-Laye International High School

France, St-Germain-en-Laye

Research/Teaching

Completed

1995

Location
France, St-Germain-en-Laye
Type
Research/Teaching
Status
Completed
Year
1995

Renault Technocentre

France, Guyancourt

Commercial/Industry

Completed

1995

Location
France, Guyancourt
Type
Commercial/Industry
Status
Completed
Year
1995

Cacharel Nîmes

France, Nimes

Commercial/Industry

Completed

1994

Location
France, Nimes
Type
Commercial/Industry
Status
Completed
Year
1994

Research laboratories of Musées de France in Le Louvres

France, Paris

Research/Teaching

Completed

1994

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1994
Programme

Underground laboratories beneath the Tuileries garden

Client

Établissement public du Grand Louvre

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (BET TCE), Pierre Focqué (BET structure verre), François Robin, Vincent Lafont (perspectiviste)

BSA team

François Guidon (chef de projet concours), Isabelle Vasseur (chef de projet chantier), Valérie Faugeras (mobilier)

Address

Passage des Lions de l’aile de Flore, Palais du Louvre 75001 Paris

Built surface

5 500 m²

Construction cost

7 M € HT (valeur 1994)

Le Sou medical

France, Paris

Commercial/Industry

Completed

1994

Location
France, Paris
Type
Commercial/Industry
Status
Completed
Year
1994

Tax Center

France, Flers

Cultural/Institutional

Completed

1993

Location
France, Flers
Type
Cultural/Institutional
Status
Completed
Year
1993

“100 years of housing” Exhibition, Pavilion de l’Arsenal

France, Paris

Cultural/Institutional

Completed

1993

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
1993

Louis Debré Foundation

France, Ernée

Cultural/Institutional

Completed

1993

Location
France, Ernée
Type
Cultural/Institutional
Status
Completed
Year
1993

La Tour des Dames High School

France, Rozay-en-Brie

Research/Teaching

Completed

1993

Location
France, Rozay-en-Brie
Type
Research/Teaching
Status
Completed
Year
1993

Police Station of Créteil

France, Créteil

Cultural/Institutional

Completed

1992

Location
France, Créteil
Type
Cultural/Institutional
Status
Completed
Year
1992
Programme

Police departmental services

Client

Ministère de l’Intérieur

Mandatory architect

Brunet Saunier Architecture

Partners team

Serete (BET), Marc Malinovsky (consultant verrière), François Morellet (intervention artistique)

BSA team

Jean-Michel Reynier (chef de projet), Eric Dufour, Vitorio Pisu, Patricia Feraru avec Jérôme Delage et Fernand Tsaropoulos

Address

Boulevard Jean Baptiste Oudry 94000 Créteil

Built surface

30 000 m²

Construction cost

19,3 M € HT (valeur 1992)

Gymnasium on rue des Rigoles

France, Paris

Cultural/Institutional

Completed

1992

Location
France, Paris
Type
Cultural/Institutional
Status
Completed
Year
1992

Industrial Building

France, Paris

Commercial/Industry

Completed

1991

Location
France, Paris
Type
Commercial/Industry
Status
Completed
Year
1991

Mines Télécom School

France, Paris

Research/Teaching

Completed

1991

Location
France, Paris
Type
Research/Teaching
Status
Completed
Year
1991

Placettes School

France, Nîmes

Research/Teaching

Completed

1991

Location
France, Nîmes
Type
Research/Teaching
Status
Completed
Year
1991

IUT of Lieusaint

France, Lieusaint

Research/Teaching

Completed

1991

Location
France, Lieusaint
Type
Research/Teaching
Status
Completed
Year
1991

Prefecture of Mayenne

France, Laval

Cultural/Institutional

Completed

1991

Location
France, Laval
Type
Cultural/Institutional
Status
Completed
Year
1991
Programme

Public reception services of the Prefecture

Client

Ministère de l’Intérieur

Mandatory architect

Brunet Saunier Architecture

Partners team

Projetud (BET), Louis Debré (intervention artistique)

BSA team

Jean Marie Parant, Eric Cugnart (concours), Jean-Paul Roynette (études et chantier)

Address

56 rue Mazagran 53000 Laval

Built surface

2 800 m²

Hérouville Saint-Clair Police Station

France, Hérouville Saint-Clair

Cultural/Institutional

Completed

1990

Location
France, Hérouville Saint-Clair
Type
Cultural/Institutional
Status
Completed
Year
1990
Programme

Central police station, offices and security rooms

Client

Secrétariat général pour l’administration de la police (SGAP) de Rennes

Mandatory architect

Brunet Saunier Architecture

Partners team

Patrick Guevel (économiste), Eric Chicaez (maquettiste)

BSA team

Philippe Vasseur (chef de projet)

Address

Avenue de la Valeuse 14200 Hérouville Saint-Clair

Built surface

1 200 m²

Construction cost

0,8 M € HT (valeur 1990)

Savies square residential building

France, Paris

Residential

Completed

1990

Location
France, Paris
Type
Residential
Status
Completed
Year
1990
Programme

90 housing units on Rue des Savies and 18 housing units on Rue de la Mare

Client

Office Public d’Aménagement et de Construction (OPAC) de Paris

Mandatory architect

Brunet Saunier Architecture

Partners team

Oth (BET TCE)

BSA team

Isabelle Vasseur et Philippe Vasseur (chefs de projet)

Address

37-57 rue de la Mare et 2-8 rue de Savies 75020 Paris

Built surface

13 000 m²

Cylinder house “The smallest tower in Europe”

France, Hérouville Saint-Clair

Residential

Completed

1990

Location
France, Hérouville Saint-Clair
Type
Residential
Status
Completed
Year
1990

Residential Building on Rue de la Marne

France, Paris

Residential

Completed

1989

Location
France, Paris
Type
Residential
Status
Completed
Year
1989

Prêt de la Manche Departmental Library

France, Saint-Lo

Cultural/Institutional

Completed

1988

Location
France, Saint-Lo
Type
Cultural/Institutional
Status
Completed
Year
1988

Superintendent of Schools

France, Hérouville Saint-Clair

Cultural/Institutional

Completed

1988

Location
France, Hérouville Saint-Clair
Type
Cultural/Institutional
Status
Completed
Year
1988

Telecommunications center

France, Flers

Cultural/Institutional

Completed

1986

Location
France, Flers
Type
Cultural/Institutional
Status
Completed
Year
1986

Gymnasium

France, Combs-la-Ville

Cultural/Institutional

Completed

1986

Location
France, Combs-la-Ville
Type
Cultural/Institutional
Status
Completed
Year
1986